Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Aker BP Gets Nod for Manned Underwater Ops in 2018
Subsea

March 6, 2018 · about 8 years ago

Aker BP Gets Nod for Manned Underwater Ops in 2018

Aker BP has received consent from Petroleum Safety Authority (PSA) Norway to perform manned underwater operations in 2018. The underwater operations will be undertaken by Aker BP’s contractor Subsea 7, at the Alvheim, Ula and Valhall fields. The underwater operations will be carried out by the divin

1 minutes read
  • LinkedIn
  • X
  • Email

Aker BP has received consent from Petroleum Safety Authority (PSA) Norway to perform manned underwater operations in 2018.

The underwater operations will be undertaken by Aker BP’s contractor Subsea 7, at the Alvheim, Ula and Valhall fields.

The underwater operations will be carried out by the diving vessels DSV Seven Falcon, DSV Seven Atlantic and LDC Seven Spray.

Schedule start-up of operations is in Q3 or Q4 of 2018, and will last around 19 days.

The Alvheim field has been developed using a floating production, storage and offloading (FPSO) unit. The field includes three discoveries: Boa, East Kameleon and Kneler. These have been developed using individual subsea facilities tied back to the Alvheim FPSO.

Ula is an oil field is in the southern part of the Norwegian sector of the North Sea. The development consists of three conventional steel facilities for production, drilling and accommodation, which are linked by bridges.

Valhall is an oil field in the southern North Sea in 70 metres of water. The field was originally developed with an accommodation facility, a drilling facility and a production facility. In 1996, a wellhead facility (Valhall WP) was installed, with slots for 19 extra wells.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaOperations & Maintenance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fatal rig incident: Search still underway for two missing workers off Gabon
  2. 2Planned wave energy project in India takes step forward
  3. 3CO2 storage appraisal campaign in UK North Sea yields positive results
  4. 4MOL and Deutsche ReGas shake hands on FSRU for German LNG terminal

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free