Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›PHOTO: Keel Laying Ceremony of JDN’s New TSHD
Dredging

July 27, 2018 · about 8 years ago

PHOTO: Keel Laying Ceremony of JDN’s New TSHD

Keppel Singmarine Pte. Ltd. last week held a keel-laying ceremony for the medium-sized 6,000m³ trailing suction hopper dredger which is being built for Jan De Nul Group. Earlier this year, JDN placed an order for six ultra-low emission TSHDs, five of which are being built at Keppel: three small 3,50

1 minutes read
  • LinkedIn
  • X
  • Email

Image source: Bureau Veritas Marine & Offshore Singapore

Keppel Singmarine Pte. Ltd. last week held a keel-laying ceremony for the medium-sized 6,000m³ trailing suction hopper dredger which is being built for Jan De Nul Group.

Earlier this year, JDN placed an order for six ultra-low emission TSHDs, five of which are being built at Keppel: three small 3,500m³, two medium-sized 6,000m³ and a larger vessel of 18,000m³ at the Cosco (Dalian) Shipyard in China.

According to the company, all six vessels will be diesel-electrical powered, with engines allowing optimal use of generated power but with low fuel consumption and emissions.

In addition, the vessels will be equipped with a two stage highly efficient exhaust gas filter system, resulting in emissions complying with the European Stage V regulations for inland waterway vessels.

Jan De Nul Group recently decided to name both 6,000m³ dredgers after two decommissioned vessels of the Groups fleet: Sanderus and Ortelius.

Main characteristics of the 6,000 m³ dredger:

Hopper capacity – 6,000 m³; Deadweight – 9,880 ton; Length o.a. – 111.7 m; Breadth – 24.6 m; Draught loaded – 7.0 m; Maximum dredging depth – 35.0 m; Diameter suction pipe – 1,000 mm; Pump power (trailing) – 1,500 kW; Pump power (discharging) – 4,000 kW; Propulsion power – 2 x 2,150 kW; Total installed diesel power – 7,700 kW; Speed – 12.5 kn; Accommodation – 16 p.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Shell to take a slice of Equinor's $10 billion oil project in Canada
  2. 2SLB and TotalEnergies enter into 15-year digital drilling agreement
  3. 3World’s first ammonia-powered dry bulk carrier ready for maiden voyage
  4. 4Weatherford expands its scope of work for Equinor

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free