Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Xervo to supply Awilco Drilling newbuild with lifeboat system
Fossil Energy

August 28, 2018 · about 8 years ago

Xervo to supply Awilco Drilling newbuild with lifeboat system

Xervo has signed a contract to deliver an R-002 lifeboat system for a new semi-submersible drilling rig for Awilco Drilling.

2 minutes read
  • LinkedIn
  • X
  • Email

Xervo, manufacturer of conventional NORSOK-approved lifeboat systems, has signed a contract to deliver an R-002 lifeboat system for a new semi-submersible drilling rig for Awilco Drilling.

Xervo said that the order included the delivery of four 75 POB complete sets of lifeboats davit systems and one FRB davit system.

At the same time, SH Group, Xervo’s parent company, received an option of delivering three similar rig systems if Awilco Drilling activates its rig options at Keppel Fels.

According to the company, delivering the Xervo approved conventional Boat-In-A-Box NORSOK-system for a semi-submersible drilling rig is a breakthrough in the industry.

As for the rig, it was designed for harsh environment use and will be equipped and certified for drilling on the Norwegian Continental Shelf, including the Barents Sea, in water depths up to 5,000 feet. The rig of the Moss CS 60 Eco MW design is scheduled for delivery from Keppel Fels in 2021.

To remind, Awilco announced in February 2018 that it was looking to expand its fleet with a newbuild rig. The rig will be built by KeppelFELS in Singapore at a price of approximately $425 million.

Following a letter of intent in February, Keppel FELS secured a contract from Awilco the following month .

Other equipment orders

Earlier this month, Rolls-Royce Commercial Marine signed a contract to deliver five engines and four large UUC thrusters for an Awilco Drilling newbuild rig.

Namely, Rolls-Royce will deliver five B33:45L8A diesel engines and four UUC high torque thrusters (3,800 kW).

Awilco also ordered dynamic positioning, automation, safety, thruster control, and navigation systems from Kongsberg Maritime along with real-time data support from Kongsberg’s Information Management System (K-IMS).

Kongsberg will also provide a complete electro package including a hybrid electric power system with advanced battery technology.

Back in March, MHWirth was selected by Awilco for the delivery of the drilling equipment package, with options for further three packages.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyEquipmentExploration & Production

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Eni sheds partial stakes in Indonesian gas assets as Pertamina and Medco bolster portfolios
  2. 2New wind for hydrogen-electric shipping as GMI-PowerCell collaboration expands to four bulk carriers
  3. 3AI, next-gen tech, and maritime decarbonization on RINA- China Merchants Energy Shipping pact’s agenda
  4. 4Stena Drilling’s 18-year-old drillship is on its way to Namibia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free