Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Green Marine›MOL, Tohoku EPCO to Advance Study on Wind Challenger Installation
Green Marine

October 15, 2019 · about 7 years ago

MOL, Tohoku EPCO to Advance Study on Wind Challenger Installation

MOL, Tohoku Electric Power are to move ahead with a joint study related to the installation of Wind Challenger.

2 minutes read
  • LinkedIn
  • X
  • Email

Japanese shipping company Mitsui O.S.K. Lines (MOL) and compatriot electric utility Tohoku Electric Power have revealed their intention to move ahead with a full-scale joint study related to the installation of the world’s first hard sail system — Wind Challenger — on a coal carrier.

The decision comes after it was recently confirmed that a vessel equipped with the Wind Challenger is acceptable in port facilities of the coal thermal power plants owned by Tohoku Electric.

Both companies plan to verify the system’s impact on discharging operation and calling in/out at coal unloading port facilities, its effect on reduction of greenhouse gas (GHG) emissions while the vessel is underway, and other factors.

The duo eyes launching the world’s first vessel equipped with the Wind Challenger after 2022.

Wind Challenger is a telescoping hard sail to convert wind energy to propulsive force and is studied in the Wind Challenger Project in which MOL takes part as a leading member.

As explained, the installation of the system on merchant ships has the potential to significantly reduce fuel consumption, which in turn reduces the environmental impact of vessel operation while improving economic efficiency.

Earlier this year, MOL and Oshima Shipbuilding obtained approval in principle (AIP) from classification society ClassNK for the design of the hard sail system. Obtaining the AIP marked the completion of the initial design related to the sail structure and controls.

The project started back in 2009 with the Wind Challenger Plan, an industry-academia joint research project led by The University of Tokyo, and from 2013, the team has been chosen to receive Subsidy for Next-generation marine environment-related technology research by the country’s Ministry of Land, Infrastructure, Transport and Tourism. In January 2018, MOL and Oshima took charge of the plan.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Green MarineBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Electrical fault triggers oil output deferral and rig intervention plans at Karoon’s Brazilian field
  2. 2TotalEnergies’ Caspian Sea gas and condensate field expansion is a go
  3. 3TotalEnergies earmarks annual spend of up to $17 billion over next five years
  4. 4Fugro performs ultra-deepwater AUV survey off East Malaysia

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free