Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›BP’s Argos platform floated onto Boskalis vessel for transport
Fossil Energy

January 29, 2021 · about 5 years ago

BP’s Argos platform floated onto Boskalis vessel for transport

BP’s Argos platform, built for the Mad Dog 2 project in the Gulf of Mexico, has been loaded onto a Boskalis vessel for transport to the U.S.

2 minutes read
  • LinkedIn
  • X
  • Email
BP's Argos platform and Boskalis' BOKA Vanguard vessel
BP’s Argos platform and Boskalis’ BOKA Vanguard vessel; Credit: Boskalis

Oil major BP’s Argos platform, built for the Mad Dog 2 project in the deepwater Gulf of Mexico, has been loaded onto a Boskalis vessel ahead of transport from South Korea to the U.S.

BP named the new platform Argos for the Mad Dog 2 project back in November 2018. The name is a reference to Odysseus’ loyal dog and a nod to the Mad Dog spar, BP’s existing production facility that is located about six nautical miles away from the Argos site.

The hull and topsides of the Argos platform were built by Samsung Heavy Industries in South Korea . The first oil production from the facility is expected in late 2021.

In an update on Friday , Boskalis said that the large Argos floating production unit (FPU) weighing nearly 70,000 tons was successfully floated onto Boskalis’ semi-submersible heavy transport vessel BOKA Vanguard last Tuesday.

Boskalis noted that the vessel was submerged well over 29 meters to make this happen.

“After years of engineering and preparation, a first impressive operational milestone in transportation from Korea to the USA was reached. The next day, the BOKA Vanguard with its cargo sailed to the quayside for sea fastening and sail-away readiness”, Boskalis stated.

BP discovered the Mad Dog field in 1998 and began production there with its first platform in 2005.

Continued appraisal drilling in the field during 2009 and 2011 doubled the resource estimate of the Mad Dog field to more than 4 billion barrels of oil equivalent, spurring the need for another platform at the field.

The final investment decision for the $9 billion project was approved by BP, as the operator, in late 2016 and in early 2017 by co-owners BHP and Union Oil Company of California, an affiliate of Chevron .

The second Mad Dog platform will be moored approximately six miles to the southwest of the existing Mad Dog platform, which is located in 4,500 feet of water about 190 miles south of New Orleans.

The Mad Dog 2 project includes the Argos platform with the capacity to produce up to 140,000 gross barrels of crude oil per day through a subsea production system from up to 14 production wells and eight water injection wells.

The project will help extend the life of the super-giant Mad Dog oil field beyond 2050.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionHeavy liftingProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1$50 billion South Korean investment pushes stalled Alaska LNG project closer to construction
  2. 2TGS on 3D imaging mission to unlock new insights into Malaysia's offshore discovery
  3. 3Petrobras strikes another oil-bearing zone in Equatorial Margin frontier
  4. 4MidOcean gets hold of $4 billion in major capital raise to fuel global LNG push

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free