Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Fossil Energy›Petrobras postpones Mero 1 first oil due to FPSO delays
Fossil Energy

April 7, 2021 · about 5 years ago

Petrobras postpones Mero 1 first oil due to FPSO delays

Petrobras has revealed that the first production from its Mero 1, through FPSO Guanabara, has been postponed due to FPSO construction delays.

2 minutes read
  • LinkedIn
  • X
  • Email
Petrobras
Illustration; Source: Petrobras

Brazilian oil and gas giant Petrobras has revealed that the first production from its Mero 1, through the FPSO Guanabara, has been postponed due to delays in FPSO construction.

Petrobras informed on Wednesday that the production expected to start from Mero 1 was postponed from the fourth quarter of 2021 to the first quarter of 2022.

The FPSO will be installed in the Mero field, which belongs to the Libra Block, in the Santos Basin pre-salt area, with a processing capacity of 180,000 barrels of oil per day.

According to Petrobras, the FPSO is being converted in China and, due to the Covid-19 pandemic scenario, there was a delay in the unit’s construction, with a consequent adjustment to the schedule.

The Mero field is operated by Petrobras (40%) in partnership with Shell Brasil Petróleo Ltda. (20%), Total E&P do Brasil Ltda. (20%), CNODC Brasil Petróleo e Gás Ltda. (10%), CNOOC Petroleum Brasil Ltda. (10%), and Pré-Sal Petróleo S.A. (PPSA), which is the contract manager.

Japan’s MODEC is responsible for the engineering, procurement, construction, mobilization, installation and operation of the FPSO Guanabara MV31 , including topsides processing equipment as well as hull and marine systems.

A MODEC group company, SOFEC, Inc., will design and supply the spread mooring system for the Petrobras FPSO.

The FPSO will be capable of processing 180,000 barrels of crude oil per day, 424 million standard cubic feet of gas per day, 225,000 barrels of water injection per day and has a storage capacity of 1,400,000 barrels of crude oil.

In related news, Petrobras has recently suspended MODEC from participating in new competitive bidding for 13 months, starting from 31 March 2021.

Related Articles

Fossil Energy

Petrobras suspends MODEC from bidding over FPSO issues

2 min read

The main basis for this administrative sanction is losses to Petrobras presumably caused by the performance of three FPSO vessels under charter services that MODEC has provided in the past and/or is presently providing to Petrobras.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Fossil EnergyFPSO & VesselsOil & GasBusiness & FinanceBusiness Developments & ProjectsExploration & ProductionProject & TendersVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil
  2. 2North Sea appraisal ops up the oil & gas discoveries’ projected size
  3. 3Vantris Energy rakes in $441.8 million for Petronas and PTTEP offshore works in Malaysia
  4. 4CNOOC keeping Worley busy on its North Sea assets for five more years

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free