Advertisement

Cabling

about 5 years ago

Seaway Phoenix ticks off first offshore wind assignment

Seaway 7’s recently converted cable laying vessel (CLV) Seaway Phoenix has completed its first assignment. The 130-meter long vessel installed its first inter-array cable at an undisclosed offshore wind project in Taiwan. According to Seaway 7, Seaway Phoenix features an AHC 34-tonne offshore crane,

1 minutes read
Seaway-Phoenix-ticks-off-first-offshore-wind-assignment
Seaway 7

Seaway 7’s recently converted cable laying vessel (CLV) Seaway Phoenix has completed its first assignment.

The 130-meter long vessel installed its first inter-array cable at an undisclosed offshore wind project in Taiwan.

According to Seaway 7, Seaway Phoenix features an AHC 34-tonne offshore crane, two work-class ROVs including a launch and recovery system, and one trenching ROV.

It has a cable loading capacity of 4,000 tonnes and two cable turntables each with a 2,000-tonne loading capacity.

To remind, Subsea 7’s renewables and heavy lifting business revealed in September last year that it will convert the Seaway Phoenix to become a dedicated inter-array grid and export cable installation and trenching support vessel.

Subsea 7 stacked the vessel following its contract end in 2018.

Advertisement

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.