Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Business Developments & Projects›Meyer Werft: LNG-powered cruise ship Arvia floated out
Business Developments & Projects

August 29, 2022 · about 4 years ago

Meyer Werft: LNG-powered cruise ship Arvia floated out

On 27 August, the new cruise ship Arvia being built for the British cruise line P&O Cruises left Meyer Werft’s covered building dock in Papenburg, Germany.

1 minutes read
  • LinkedIn
  • X
  • Email
Arvia
Meyer Werft

On 27 August, the new cruise ship Arvia being built for the British cruise line P&O Cruises left Meyer Werft’s covered building dock in Papenburg, Germany.

Following the float out, the newbuilding moored at the outfitting pier in the shipyard harbor, where the masts and funnel will be lifted onto the ship by crane.

The cruise ship will lie in the shipyard harbor until the river Ems conveyance in October. Until the conveyance, the interior work on board will be continued and further technical tests will be carried out.

The Arvia measures over 180,000 GT, is 344.5 metres long, 42 metres wide and identical in construction to her sister ship Iona , which was delivered in 2020.

Related Articles

Clean Fuel

Keel laid for P&O Cruises’ second LNG eco-friendly ship

2 min read

After its completion, around 5,200 passengers will be able to go on board. Like Iona, Arvia will be powered by environmentally friendly liquefied natural gas (LNG) . This ensures significantly lower emissions at sea, as neither sulphur oxides nor soot particles are released.

After the undocking of the Arvia, the floating engine room module (FERU) for the Carnival Jubilee , planned for delivery at the end of 2023, will be manoeuvred into the then free building dock II. The front part of the cruise ship has already been built there in block construction over the past few months.

The FERU was built at Neptun Werft in Rostock and was transferred to Papenburg a week ago.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business Developments & ProjectsInfrastructureVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1The 2.5X gamble: Nuclear-powered LNG carriers could upend maritime shipping
  2. 222-year Cheniere-Petrobras LNG pact expands energy bridge between North and South America
  3. 3Next chapter of Shell’s Canadian LNG project brings Fluor-JGC JV multibillion-dollar award
  4. 4Subsea production systems for Mozambique’s deepwater LNG project ordered from OneSubsea

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free