Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Cabling›Keel laid for Korea’s only specialized HVDC installation vessel
Cabling

September 1, 2026 · 27 days ago

Keel laid for Korea’s only specialized HVDC installation vessel

The Tersan Shipyard in Türkiye has laid the keel for the cable-laying vessel (CLV) it is constructing for South Korean subsea cable installation company LS Marine Solution. LS Marine Solution and the shipyard signed a contract for the construction of the vessel in June 2025, followed by the start of

1 minutes read
  • LinkedIn
  • X
  • Email
Keel laid for Korea’s only specialized HVDC installation vessel
Source: Tersan Shipyard via LinkedIn

The Tersan Shipyard in Türkiye has laid the keel for the cable-laying vessel (CLV) it is constructing for South Korean subsea cable installation company LS Marine Solution.

LS Marine Solution and the shipyard signed a contract for the construction of the vessel in June 2025, followed by the start of construction in July 2026.

“We have successfully celebrated the keel laying of the next‑generation cable laying vessel InterOcean (Hull No. NB1139) which we built for LS Marine Solution. This milestone ceremony marks the official transition of the project into the construction phase, while highlighting the strong partnership between the two companies and underlining the vessel’s innovative role within the industry,” Tersan Shipyard reported on August 31.

Representing an investment of approximately €221 million, the CLV will be 148.4 meters long and 31 meters wide, and will have a load capacity of 13,000 tons and a total displacement of 18,800 tons.

Related Articles

Cabling

Kongsberg Maritime equipment ordered for South Korean cable laying vessel

2 min read

Designed by Norwegian Salt Ship Design, the vessel will be capable of simultaneously laying HVDC submarine cables and fiber optic cables and will be one of the world’s top five in terms of cable loading capacity and the largest in Asia, as well as Korea’s only specialized HVDC installation vessel, according to LS Marine Solution.

Delivery is expected in the first half of 2028.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

CablingGridOffshore WindSubseaVesselsVessels & VehiclesBusiness Developments & ProjectsOutlook & Strategy

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Fugro performs ultra-deepwater AUV survey off East Malaysia
  2. 2Southeast Asian oil field development clears key environmental hurdle to move toward FID
  3. 3‘Major’ oil & gas player awards Shearwater with three-year contract off South America
  4. 4Noble’s 2013-built drillship scoops up 10-well job in Africa with Tullow Oil

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free