Business & Finance
Readers’ Pick of the Week (July 14-18, 2014)
VIDEO: Float-On and Transport of Costa Concordia Onboard Dockwise Vanguard Following the successful parbuckling of Costa Concordia, and in anticipation of the pending refloat, Dockwise, a wholly-owned subsidiary of Royal Boskalis Westminster N.V., provides…Read more LPG Tanker Attacked by Pirates of
Top News – July 14 to 20, 2014
Boskalis Consortium Bags Singapore Port Expansion Contract Royal Boskalis Westminster N.V. (Boskalis) has in consortium been awarded work associated with the expansion of the Singapore Tuas Mega Port development. Experts Doubt Panama Canal Expansion Will Be “Game Changer” The expansion of the Pana
PSA reviews pressure drilling on COSL Innovator
From 10 to 13 June 2014, the Petroleum Safety Authority Norway carried out an audit of Statoil’s use of managed pressure drilling using COSL Innovator on the Troll field. The objective of the activity was to audit that Statoil, the service providers, drilling contractor and other stakeholders, were
Statoil’s MDR monitoring on Heimdal needs improvement
From 24 March to 18 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s monitoring of major-accident and OHAS risk associated with a modular drilling rig (MDR) in temporary use for well plugging at the Heimdal facility. The objective of the activity was to audit
Loggers Noise Solutions for World’s Largest Dredgers
During its 91st session in November 2012, IMO’s Maritime Safety Committee (MSC) adopted a number of amendments to the International Convention for the Safety of Life at Sea (SOLAS). Among these amendments was the adoption of the new SOLAS regulation II-1/3-12, which requires ships to be constructed
Veessen-Wapenveld Channel: Scale Model Tests Underway
To protect Deventer, Zutphen and the villages on the IJssel River from extreme high water and flooding, an eight-kilometre-long channel is being created between Veessen and Wapenveld. Work will start after the summer on the channel, which can take a maximum of 45% of the water from the IJssel. Scale
PSA Carries Out Audit of Aasta Hansteen Facility
In June, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s engineering of the Aasta Hansteen facility. Objective The objective of the audit was to assess whether Statoil’s and the contractors’ management of detail engineering in the area of OHAS was being carried out in c
Environment Agency to Host Drop-In Sessions for Post-Flood Advice
The UK Environment Agency is inviting people living in Keynsham, near Bristol, and Bradford-on-Avon to drop-in surgeries about flooding. The surgery for, Keynsham, which includes Broadmead Industrial Estate, at the Riverside Suite, Keynsham Leisure Centre, Temple Street, Keynsham, on Wednesday 23 Ju
TÜV SÜD to Present Its Entire Service Range at WindEnergy Hamburg 2014
At WindEnergy Hamburg 2014, TÜV SÜD will showcase its complete suite of services for the offshore and onshore wind energy industry. The international technical services company supports designers, suppliers, manufacturers and owners by providing testing, certification and inspection services (Hall A
Engineering of Aasta Hansteen platform subject of PSA inspection
From 3 to 25 June 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of Statoil’s engineering of the Aasta Hansteen spar platform. The objective of the audit was to assess whether Statoil’s and the contractors’ management of detail engineering in the area of OHAS was being carrie
Antwerp to Make LNG Permanently Available
By 2016, it should be possible for barges to fill up with LNG at a permanent bunkering station in the port of Antwerp, the port officials announced. Truck-to-ship bunkering is already possible, but by setting up a bunkering station the port of Antwerp aims to make LNG permanently available. In com
PSA Audits Statoil’s Managed Pressure Drilling on Troll Field
From 10 to 13 June 2014, the Petroleum Safety Authority Norway carried out an audit of Statoil’s use of managed pressure drilling using COSL Innovator on the Troll field. Objective The objective of the activity was to audit that Statoil, the service providers, drilling contractor and other stakehold
New Milestone for DMC’s Optima Nozzle Series
Damen Marine Components (DMC), part of Damen Shipyards Group, has smashed its propeller nozzle world record by 33 percent downwards. This downsizing to an inside diameter of 665 millimetres only – from the previous 1,000 mm ‘entry level model’ – marks a new milestone for DMC’s Optima Nozzle series.
PSA audits Gjøa platform (Norway)
From 5 to 8 May 2014, the Petroleum Safety Authority Norway (PSA) carried out an audit of GDF SUEZ E&P Norge AS (GDF) on board the Gjøa platform. The objective of the audit was to monitor GDF’s work in complying with its own and the authorities’ requirements for barrier management and follow-up on G