Advertisement

Business & Finance

Scour Prevention Systems Wins ‘One to Watch’ Award (UK)
Business & Finance

Scour Prevention Systems Wins ‘One to Watch’ Award (UK)

Lowestoft based start-up Scour Prevention Systems has won the ‘One to Watch’ award at the East Anglian Daily Times Business Awards 2013. The company, based at the OrbisEnergy innovation centre, has developed an innovative and patented solution to prevent scour around the base of offshore structures

about 13 years ago
IHC Merwede to Deliver New FPSO Offloading Systems
Business & Finance

IHC Merwede to Deliver New FPSO Offloading Systems

IHC Merwede has announced that it has signed two new contracts for the EPC (engineering, procurement and construction) delivery of offloading system packages for five FPSO vessels (floating production storage and offloading). The first of these packages will be placed on to one of MODEC’s FPSO vesse

about 13 years ago
NDM Secures New Equipment Contract
Business & Finance

NDM Secures New Equipment Contract

Norwegian Deck Machinery (NDM) announced that the company has secured a new contract with Havyard Ship Technology for delivery of winches to their newbuilding 115 for Marine Platforms Limited (MPL). The vessel is a Havyard 857 Subsea IMR vessel and will be delivered from the yard in Q3 2014. For thi

about 13 years ago
Noreq Boss Takes Over Harding CEO Position (Norway)
Business & Finance

Noreq Boss Takes Over Harding CEO Position (Norway)

Since new owners took over Schat-Harding and Noreq in June, Styrk Bekkenes, chief executive of Noreq, has been appointed CEO of Harding – a new large joint company for the development and production of life-saving equipment. Harding will have more than 900 employees in 30 different locations worldwi

about 13 years ago
UK: Industry Representatives Discussed Future of Fishing
Business & Finance

UK: Industry Representatives Discussed Future of Fishing

UK fishermen spanning large, offshore vessels as well as the small-scale fleet challenged the Fisheries Minister on their future at what has been called ‘the most pivotal cross roads the industry has experienced in decades’. Fisheries Minister, Richard Benyon M.P., opened himself up to strong questi

about 13 years ago

Advertisement

Export Cables Installed at Gwynt y Môr Offshore Wind Farm
Business & Finance

Export Cables Installed at Gwynt y Môr Offshore Wind Farm

All four export cables have been installed at RWE npower renewables’ flagship Gwynt y Môr Offshore Wind Farm off the North Wales coast. The final subsea cable burial was completed between the coast and one of the two offshore substations on Tuesday 2 July. In addition, half of the foundations are fi

about 13 years ago
Northern Petroleum Names New Managing Director (UK)
Business & Finance

Northern Petroleum Names New Managing Director (UK)

Northern Petroleum Plc, the full cycle oil and gas company with a portfolio of production, development and exploration assets, announces the appointment of Keith Bush (43) as Managing Director. Keith Bush joined Northern in May 2012 as Chief Operating Officer and was appointed to the Board last Nove

about 13 years ago
Volstad Shipping Orders Subsea IMR and Construction Vessel from Tersan Shipyard
Business & Finance

Volstad Shipping Orders Subsea IMR and Construction Vessel from Tersan Shipyard

Volstad Shipping AS has signed a contract with Tersan Shipyard in Turkey regarding building of a Subsea IMR and Construction Vessel. The contract was signed July 4th 2013 and is subject to satisfactory financing. The new vessel has main dimensions of 128.5m x 25m and is of ST-259 design. Estimated d

about 13 years ago
Volstad Shipping Orders Subsea Construction Vessel from Turkey
Business & Finance

Volstad Shipping Orders Subsea Construction Vessel from Turkey

Volstad Shipping AS has signed a contract with Tersan Shipyard in Turkey regarding building of a Subsea IMR and Construction Vessel. The contract was signed July 4th 2013 and is subject to satisfactory financing. The new vessel has main dimensions of 128.5m x 25m and is of ST-259 design. Estimated d

about 13 years ago
Aker Solutions to Provide Topside Equipment for Drilling Rig in Baku, Azerbaijan
Business & Finance

Aker Solutions to Provide Topside Equipment for Drilling Rig in Baku, Azerbaijan

Aker Solutions won a contract from Caspian Drilling Company Ltd (CDC) to provide a complete topside equipment package for a new semi-submersible drilling rig in Baku, Azerbaijan. The parties agreed not to disclose the value of the order. Aker Solutions has previously delivered drilling equipment to

about 13 years ago

Advertisement

NPD: June Production Down 11 Pct (Norway)
Business & Finance

NPD: June Production Down 11 Pct (Norway)

The Norwegian Petroleum Directorate has announced that preliminary production figures for June 2013 indicate an average daily production of about 1 111 684 000 barrels of oil, NGL and condensate. This is 215 000 barrels per day (about 11 percent) less than in May 2013. Total gas sales were about 8.4

about 13 years ago
Liebherr Presents Its Offshore Crane Simulator at Offshore Europe 2013 (UK)
Business & Finance

Liebherr Presents Its Offshore Crane Simulator at Offshore Europe 2013 (UK)

Liebherr has launched its range of maritime crane simulators. Based on original software and hardware, the Liebherr simulators increase safety and productivity by providing a cost-effective and highly professional crane operator training solution. In September, the simulator will be part of the Lieb

about 13 years ago
CGG Provides Vessel Utilization Update for Second Quarter 2013
Business & Finance

CGG Provides Vessel Utilization Update for Second Quarter 2013

CGG provides its vessel utilization and its fleet allocation for the second quarter of 2013. Vessel utilization for the second quarter 2013: – The vessel availability rate was 93%. This compares to a 91% availability rate in the second quarter of 2012 and a 88% rate in the first quarter of 2013. – T

about 13 years ago
UK: Alicat Workboats Completes 30th Vessel Lift
Business & Finance

UK: Alicat Workboats Completes 30th Vessel Lift

Yesterday, Alicat Workboats reached a milestone as they successfully completed the 30th vessel lift using their new 200T Wise travel hoist. Only opened 76 days ago, at opening day on 24th April 2013, the lift has now averaged one lift every 2.5 days since it opened. This latest vessel was the Kings

about 13 years ago