Advertisement

Business & Finance

VIDEO: Ulstein Designed IMR Vessel – Seven Viking
Business & Finance

VIDEO: Ulstein Designed IMR Vessel – Seven Viking

Ulstein Group has presented its new IMR vessel design in a short video. The Seven Viking is a state-of-the-art vessel, with the innovative X-BOW® it is designed to meet the high demands of Inspection Maintenance and Repair (IMR), Survey and Light Construction in some of the harshest environments. Th

about 13 years ago
Jee Employee Receives Young Emerging Talent Award (UK)
Business & Finance

Jee Employee Receives Young Emerging Talent Award (UK)

Paul Otway of Jee Ltd has been awarded the Young Emerging Talent award at the Subsea UK Business Awards at the Aberdeen Exhibition and Conference Centre on 6 February. The award is designed to recognise young individuals showing the most promise in the subsea sector. Paul, 27, won for his work on pr

about 13 years ago
VIDEO: Dismantling of Blockbuster (The Netherlands)
Business & Finance

VIDEO: Dismantling of Blockbuster (The Netherlands)

The Blockbuster, one of the key players in the construction of Maasvlakte 2, will soon commence its “second life.” This content is available after accepting the cookies. Change cookie-settings View on Youtube. The Blockbuster was disassembled and shipped to the Caspian Sea to work on the Saipem’s ne

about 13 years ago
TGS Revenues Double in 4Q 2012 (Norway)
Business & Finance

TGS Revenues Double in 4Q 2012 (Norway)

TGS reports net revenues of USD 281.4 million in Q4 2012, compared to USD 180.9 million in Q4 2011, a 56% increase. The Company’s operational multi-client investments were USD 95.3 million, up 56% from Q4 2011. TGS’ net late sales totaled USD 203.7 million, up 29% from Q4 2011. At the meeting held o

about 13 years ago
Germany: HHLA Fulfils 2012 Forecast
Business & Finance

Germany: HHLA Fulfils 2012 Forecast

According to preliminary unaudited figures, HHLA achieved Group revenue of approx. € 1,125 million (previous year: € 1,217 million) and an operating result (EBIT) of around € 185 million (previous year: € 207 million) in the 2012 financial year. The related business conditions were characterised by

about 13 years ago

Advertisement

UK: HMS Queen Elizabeth’s Forward Island Starts Delivery Journey
Business & Finance

UK: HMS Queen Elizabeth’s Forward Island Starts Delivery Journey

The most iconic section of HMS Queen Elizabeth, the Forward Island containing the bridge, has begun her delivery journey from the dock hall on HM Naval Base Portsmouth where the first steel was cut just 70 weeks ago. After leaving the dock hall’s basin and passing through a lock, the Forward Island

about 13 years ago
EWEA 2013: ‘What Does the Economic Crisis Mean for the Wind Industry?’ (Austria)
Business & Finance

EWEA 2013: ‘What Does the Economic Crisis Mean for the Wind Industry?’ (Austria)

The wind industry is facing tough times, as many industries in the ongoing economic crisis are, but what do industry leaders think are the consequences of this difficult period? The question of whether or not consolidation is or will be taking place in wind energy was key for the six CEOs sitting on

about 13 years ago
Subsea UK 2013: EPC Offshore Wins Subsea Company of the Year title
Business & Finance

Subsea UK 2013: EPC Offshore Wins Subsea Company of the Year title

An oil and gas concept development and project management company EPC Offshore has won the coveted Subsea Company of the Year title at the Subsea UK Business Awards 2013. The top accolade, which acknowledges excellence and achievement in the subsea industry, was awarded to EPC Offshore in recognitio

about 13 years ago
Heerema Fabrication Group Signs LoA with Statoil for Dagny Jacket Construction
Business & Finance

Heerema Fabrication Group Signs LoA with Statoil for Dagny Jacket Construction

Heerema Fabrication Group’s Vlissingen yard in the Netherlands last week signed the Letter of Award with Statoil for the engineering, procurement and construction of a fixed jacket for the Dagny field development in the central part of the North Sea. Following the award to HFG’s engineering firm HFG

about 13 years ago
Subsea UK 2013: Innovation and Achievement Awards Presented
Business & Finance

Subsea UK 2013: Innovation and Achievement Awards Presented

A host of successes within the subsea sector were celebrated last night at Subsea UK’s seventh annual awards ceremony, which aims to recognise innovation and outstanding achievements across the UK subsea industry. Sponsored by Forum Energy Technologies, the dinner attracted over 800 guests from acro

about 13 years ago

Advertisement

UK: Partrac Reports Busy 2012
Business & Finance

UK: Partrac Reports Busy 2012

In completing over 85% of all energy resources assessments for the domestic scene, Partrac have established themselves as the leading survey company able to deliver high quality data from these environments. Technical Director Kevin Black said: “We have just completed internal reviews for our 2012 A

about 13 years ago
Heerema to Build Jacket for Statoil’s Dagny Development
Business & Finance

Heerema to Build Jacket for Statoil’s Dagny Development

Heerema Fabrication Group’s Vlissingen yard in the Netherlands last week signed the Letter of Award with Statoil for the engineering, procurement and construction of a fixed jacket for the Dagny field development in the central part of the North Sea. Following the award to HFG’s engineering firm HFG

about 13 years ago
Stork Names New HSSEQ Director for UK and Africa
Business & Finance

Stork Names New HSSEQ Director for UK and Africa

Stork Technical Services, the leading global provider of knowledge-based asset integrity management services for the oil and gas, chemical and power sectors, has underlined its commitment to safety with the appointment of Steven Law to the role of HSSEQ Director – UK & Africa. Law takes on the posit

about 13 years ago
Singapore’s Sembcorp to Build Ivar Aasen PDQ for $726 Mln
Business & Finance

Singapore’s Sembcorp to Build Ivar Aasen PDQ for $726 Mln

SMOE, a wholly-owned subsidiary of Sembcorp Marine, has secured a contract worth about S$900 million ($726 million) from Det norske oljeselskap ASA, Norway for engineering, procurement and construction of the Process, Drilling and Quarters Platform (pdQ) Topsides to be installed at a water depth of

about 13 years ago