
Aker Solutions and the Marine Energy Test Centre (METCentre) in Norway have signed a front-end engineering and design (FEED) contract for a pilot project which will see Aker Solutions testing its new power transmission technology at the METCentre’s offshore test area that houses demonstration floati

The Viking Link electricity interconnector between the UK and Denmark has commenced operations, now transporting power between the two countries. Deemed the world’s longest land and subsea interconnector, the £1.7 billion Viking Link started commercial operations on December 29, 2023. The link has