Advertisement

Dredging

Perry Barr and Witton Scheme in Full Swing
Dredging

Perry Barr and Witton Scheme in Full Swing

The Environment Agency has just released the latest update on the Perry Barr and Witton flood risk management scheme. The Agency has begun the wall improvements and will carry out river channel works through Witton, down to Gravelly Industrial Estate. Construction work should be complete by July 201

about 11 years ago
Dutch Risk Reduction Team in Myanmar
Dredging

Dutch Risk Reduction Team in Myanmar

Following the extreme rainfall and subsequent floods late July and early August, the Myanmar government requested the Dutch Government for an expert judgement on improvement of their flood protection system. Rob Steijn of consultancy firm Arcadis was leader of the Dutch Risk Reduction (DRR) team of

about 11 years ago
Work on Woodbridge Floodwall Begins
Dredging

Work on Woodbridge Floodwall Begins

The Environment Agency started work this week to repair the flood defense along the River Deben at Tide Mill Quay and Ferry Quay in Woodbridge. The defense reduces the risk of flooding to 416 homes and businesses in the town. The first stage of the work will involve the Environment Agency replacing

about 11 years ago
ICE to Hold Managed Realignment Lecture
Dredging

ICE to Hold Managed Realignment Lecture

The Institution of Civil Engineers (ICE) will be the organizer of the Managed Realignment Lecture 2015 in London. Managed realignment is an approach that involves altering the location of the line of defense against coastal, estuarine or fluvial flooding. The event will highlight two managed realign

about 11 years ago
Van Oord Wins Award for Broomhill Sands Scheme
Dredging

Van Oord Wins Award for Broomhill Sands Scheme

Team Van Oord has won the UK’s Environment Agency Exemplar Health Safety & Environmental Performance Award for Broomhill Sands coastal defense scheme. This project includes improving a 700m length shingle beach, replacement of 8 timber groynes and constructing a 1,700m rock revetment and wave wall a

about 11 years ago

Advertisement

Picture of the Day: Boskalis in Cowes
Dredging

Picture of the Day: Boskalis in Cowes

Cowes Harbour Commission’s contractors Boskalis Westminster recently began the final stages of works on the Cowes Breakwater project. According to the CHC, this involves a final reshaping of the breakwater’s gravel core, bringing sections into profile before applying layers of small rock that act as

about 11 years ago
Comments Invited for Gunsite Sea Wall Plan
Dredging

Comments Invited for Gunsite Sea Wall Plan

The Transport and Technical Services Department (TTS) is asking for public input on a scheme to raise the sea wall near the Gunsite slipway, according to the Information and Public Services for the Island of Jersey. TTS recently announced proposals to raise the sea wall between the Gunsite slip and

about 11 years ago
Whittlesey Washes Phase Two Almost Finished
Dredging

Whittlesey Washes Phase Two Almost Finished

The second phase of improvements to flood banks at Whittlesey Washes is nearly complete. The Green Wheel cycle path between Stanground and Whittlesey was expected to remain diverted until the end of November, while a low, 249m-long concrete wall was built as part of a scheme to improve flood defense

about 11 years ago
Yukon Harbor Plan Unveiled
Dredging

Yukon Harbor Plan Unveiled

The new Yukon harbor will emerge on the north side of the Yangtze canal (port number 9845), according to the Port of Rotterdam Authority. The harbor basin will be located between the Euromax container terminal and the gate terminal of Vopak and Gasunie. The consortium Hakkers Van Oord will execute t

about 11 years ago
Liebherr Extends Its Product Portfolio
Dredging

Liebherr Extends Its Product Portfolio

Liebherr extends its generation 6 crawler tractor series to include the PR 726 Litronic, the successor to the successful PR 724. The series now totals four models with operating weights of approximately 16 tonnes to 41 tonnes, which comply with the emissions standards of Stage IV / Tier 4f. The new

about 11 years ago

Advertisement

Liebherr’s HS 8300 HD for Italian Customer
Dredging

Liebherr’s HS 8300 HD for Italian Customer

Liebherr has just announced that their first model of the HS 8300 HD, the largest duty cycle crawler crane of Liebherr’s well-known HS series, has been sold to the Chioggia (Italy) based customer Zeta S.r.l. This piece of equipment will be installed on a ship for various dredging jobs in the Mediter

about 11 years ago
Pupils to Name New Dredger
Dredging

Pupils to Name New Dredger

Children at primary schools in the Buckie area are to help decide the name of Moray Council’s new £2.4 million dredger. A competition is being run over the next few weeks when pupils will be asked to suggest a suitable name for the vessel, which is currently under construction at the Macduff Shipyar

about 11 years ago
Aberystwyth Marina Dredging Announced
Dredging

Aberystwyth Marina Dredging Announced

Cardiff Marine Group Ltd., the company that recently purchased Aberystwyth Marina, has announced development plan for the newly acquired marina. The company is planning a number of phased investments that will upgrade the marina. According to Christopher Odling-Smee, Director of Cardiff Marine Group

about 11 years ago
New Terra et Aqua Published
Dredging

New Terra et Aqua Published

International Association of Dredging Companies (IADC) has just introduced the latest issue of Terra et Aqua, their official quarterly publication. The magazine is supported solely by the IADC as a service to the world-wide dredging community and represents IADC’s commitment to the highest standards

about 11 years ago