Van Oord had a better business result in 2013 than in 2012. The year closed with an almost equal turnover of EUR 1,641 million (2012: EUR 1,676 million). At EUR 130 million, the net profit was considerably higher than in 2012 (EUR 98 million), and the company’s order portfolio was similar to the pre
The Port of Mahon dredging project officially commenced on 3rd March. According to portsdebalears.com, two dredgers will be used in this very important cleanup program. The dredger Von Rocks will deposit the mud brought up from the seabed onto two barges pulled by the tug boat Napia, which will then
The Hafan Pwllheli marina dredging program, located in North Wales, is moving ahead, according to pbo.co.uk. The dredger is on site and making good progress, said Wil Williams, Hafan Pwllheli marina manager, and added: “We expect the work to be finished in readiness for the new season.” Around 90,00
Oceanology International 2014 sees the launch of a new range of Gyrocompass products based on the well proven MRU technology from Kongsberg Maritime’s sensor ‘Powerhouse’, Kongsberg Seatex. The first model available is MGC R3, which includes three Ring Laser Gyros (RLGs) and three linear acceleromet
CLA, the membership organisation for owners of land, property and businesses in rural England and Wales, has welcomed Environment Secretary Owen Paterson’s written ministerial statement on reducing the threat of future flooding. CLA President Henry Robinson said: “Mr Paterson’s written ministerial s
Since the release of the proposed 20 Year Plan last week, there has been a lot of discussion about the costings and cause of the floods that have devastated the Somerset Levels over the past 2 months. Flooding on the Levels Action Group (FLAG) insists that dredging will make a major difference to th
The report “Harbour Approach Channels Design Guidelines”, published by PIANC Working Group 121, was presented yesterday in Puertos del Estado headquarters, Madrid, Spain. The presentation was done during a technical meeting organized by ATPyC (Spanish Section of the International Association of Navi
Environment Agency Chairman Lord Chris Smith was joined by representatives from Associated British Ports and North East Lincolnshire Council during a recent visit to see a new flood defence take shape near to Blundell Park in Cleethorpes. The works are part of the £20-million Grimsby Flood Alleviati
BD Westby has started to dredge the River Avon in Stratford-upon-Avon, reports the Stratford Herald. River Avon was previously dredged in 2001. Dredging operations, undertaken under the Clopton and Tramway bridges, are scheduled to last three to four weeks. “We’re removing the deposits of leaves and
Caterpillar has introduced its new Cat® 311F RR excavator, powered with a 70 net horsepower (52 kW) C3.4B engine that meets U.S. EPA Tier 4 Final emissions standards. The new machine features a reduced radius that limits over-the-side tail swing to just 20 inches (508 mm). A massive 5,400-pound (2 4
Last week, the director of Slovenian Maritime Administration (SMA) Jadran Klinec and Luka Koper’s Management Board President Gašpar Gašpar Mišič signed a letter of intent in order to provide a comprehensive collaboration with a special emphasis on the following issues: – regular forms of professiona
Uljanik to Build Dredger for IHC Merwede On February 28, 2014, IHC Global Production B.V, part of IHC Merwede, and Uljanik d.d. signed the contract for the construction of one self-propelled cutter suction dredger. UK: Boskalis Westminster Wins Cowes Breakwater Contract Cowes Harbour Commission (C
IHC Merwede has successfully named and launched the 23,545kW self-propelled cutter suction dredger ‘AL BAHAR’ C/D HUTA 12 in a ceremony on 8 March 2014 at the company’s shipyard in Kinderdijk, The Netherlands. The ceremony was performed by Ms. Sylvia Wuebbens, the daughter of Mr. M. Wuebbens, the Ma
Dublin Port Company has lodged a planning application with An Bord Pleanála for its Alexandra Basin Redevelopment (ABR) Project. The application is being made under the Planning and Development Act and follows a twelve month consultation with industry, government, customer and community stakeholders