Ackermans & van Haaren has announced its interim financial report for the first quarter of 2013. DEME In Belgium, the works for the offshore wind farm of Northwind were started up, while those for the third phase of C-Power continued. Several other large sites where DEME (AvI I 50%) will be active i
Norway-based boat handling system and specialised davit supplier Vestdavit has been contracted to supply work boat and man overboard davits for four specially designed chase vessels which will support Norwegian seismic major PGS’ fleet of seismic ships. The ships are to be built at Turkey’s BEŞIKTAŞ
IEV Holdings Limited has achieved a new record in securing a contract for the supply of its proprietary Marine Growth Preventer (“MGP”) products valued at a total of approximately USD 1.45 million (“Contract”). The Contract is the single largest order for MGP products secured by the Group to date. I
Cummins Inc, a leading manufacturer of diesel engines for the commercial marine industry, will feature one of the most impressive engine line-ups at Nor-Shipping (Oslo, Norway; June 4-7) with a “smallest-to-largest” commercial marine engine display featuring the QSB7 at 132 hp (98 kW) and the QSK95
Subsea transformers are an ABB innovation. Deployed in extreme conditions in ultra-deepwater, these high-tech workhorses provide the power for heavy-duty equipment on the sea floor – enabling declining oil and gas fields to be more productive and making new deepwater fields accessible. ABB has deliv
Subsea transformers are an ABB innovation. Deployed in extreme conditions in ultra-deepwater, these high-tech workhorses provide the power for heavy-duty equipment on the sea floor – enabling declining oil and gas fields to be more productive and making new deepwater fields accessible. ABB delivered
Press Release – Marine Cybernetics AS (MC) recently signed its first contract for delivery of HIL testing (Hardware in the Loop) to a total of 6 MODU (Mobile Drilling Units) new builds to be hired by Petrobras in Brazil. Marine Cybernetics has for many years worked actively to get into this market,
Cargotec’s MacGregor has received EUR 37 million order from Hornbeck Offshore Services Inc. to deliver four 250-tonne active heave-compensated (AHC) subsea cranes for four multi-purpose supply vessels (MPSV). The cranes will be delivered between fourth quarter 2014 and third quarter 2015. The order
Cargotec’s MacGregor has received EUR 37 million order from Hornbeck Offshore Services Inc. to deliver four 250-tonne active heave-compensated (AHC) subsea cranes for four multi-purpose supply vessels (MPSV). The cranes will be delivered between fourth quarter 2014 and third quarter 2015. The order
Along the banks of the Cemetery Resaca in the historic Old City Cemetery in Brownsville, the Brownsville Public Utilities Board officially recently marked the launch of the Resaca Restoration Project. BPUB workers, special guests and residents from the neighborhood attended the ceremony marking the
The final shipment of steel pipes for Australia Pacific LNG’s 530km high pressure gas pipeline has arrived on schedule and was unloaded in Gladstone Port, Queensland on Monday. Manufacturing and transporting the steel pipe for Australia Pacific LNG’s pipeline to Australia has been a major logistical
Public Enterprises Minister, Mr Malusi Gigaba today unveiled Transnet’s seven new state-of-the-art ship-to-shore cranes at the Durban Container Terminal – Pier 2 as the company surges ahead in its drive to boost productivity and efficiency in arguably the Southern hemisphere’s biggest and busiest po
Four Konecranes Super Post Panamax STS cranes are on their way to the Port of Savannah, Georgia, operated by the Georgia Ports Authority (GPA). The cranes are part of an order that Konecranes received in 2011. In addition to the four STS cranes, the order included 20 Konecranes Rubber Tired Gantry (
Vector Technology Group Subsea Division last delivered its solutions for the Marine Well Containment System Project in the Gulf of Mexico. The scope of supply was to design, manufacture, assemble and test two safety systems to connect two free standing risers at the top and bottom locations that cou