Advertisement

Equipment

Scientists Embark on Atlantis Massif Core Sampling Campaign
Equipment

Scientists Embark on Atlantis Massif Core Sampling Campaign

An international team of scientists are setting sail today on board the Royal Research Ship James Cook to explore the Atlantis Massif, a 4000 metre high underwater mountain in the Atlantic Ocean. This is the first time the 89.2 meters long UK research ship will be used to drill through the Earth’s m

about 11 years ago
DESET Technology on Display
Equipment

DESET Technology on Display

PROGROUPE has presented a new promotional video of the DESET (DEwatering SEdiment Technology), produced in cooperation with the local authorities managing Veľké Kozmálovce reservoir. The promotional operation presented the real conditions of the dredging and dewatering in their technological headqua

about 11 years ago
Proserv bags Johan Sverdrup work
Equipment

Proserv bags Johan Sverdrup work

Proserv, an energy services company, has secured a contract with a value of more than 20 million NOK ($2.4 million) to provide topside control equipment at one of the largest field discoveries on the Norwegian Continental Shelf, Johan Sverdrup. The agreement will see Proserv supplying Aibel, on beha

about 11 years ago
Nortech, Wilton Engineering join forces to deliver EPC services (UK)
Equipment

Nortech, Wilton Engineering join forces to deliver EPC services (UK)

Nortech Group and Wilton Engineering, two North East England’s oil and gas supply chain companies, have formed a new collaborative arrangement to deliver full-service engineering, procurement and construction (EPC) for brownfield oil and gas projects in the UK. The companies said in a press release

about 11 years ago
Gardline Teams Up with OPT on Offshore Monitoring Solutions
Equipment

Gardline Teams Up with OPT on Offshore Monitoring Solutions

Ocean Power Technologies OPT has entered a memorandum of understanding (MOU) with Gardline Environmental to jointly develop metocean monitoring and maritime security systems for ocean observing and defense and security markets. The MOU outlines a multi-phase effort which is the basis for ongoing col

about 11 years ago

Advertisement

TGS Profit Declines
Equipment

TGS Profit Declines

Seismic contractor TGS has posted third-quarter 2015 net income of $40 million, compared to $54.6 million in the same period in 2014. Earnings per share were $0.39, down from $0.53 in Q3 2014. The Oslo-listed company reported revenues of $169 million in Q3 2015 (89% accounted to multi-client), versu

about 11 years ago
PGS Takes USD 110 Mln Loss
Equipment

PGS Takes USD 110 Mln Loss

Oslo-listed seismic player, Petroleum Geo-Services (PGS), has posted net loss of $110 million for the third quarter of 2015, compared with $8.4 million profit in the corresponding period in 2014. In the third quarter of 2015, the company recorded revenues of $225.7 million (out of which $120.4 milli

about 11 years ago
Bureau Veritas approves GTT’s Mark V tech
Equipment

Bureau Veritas approves GTT’s Mark V tech

Bureau Veritas informed it has issued Design Approval for the new Mark V LNG membrane containment system designed by France’s GTT.

about 11 years ago
ABB Delivers Power to New Troll A Compressors
Equipment

ABB Delivers Power to New Troll A Compressors

ABB has completed its second power-from-shore system for Troll A, the world’s largest offshore gas platform, which is operated by Statoil and located in the North Sea about 70 km west of the Kollsnes onshore gas treatment plant, outside Bergen. As with the first system, the purpose is to power two c

about 11 years ago
Statoil: Minister of EEA and EU affairs visits Troll A platform
Equipment

Statoil: Minister of EEA and EU affairs visits Troll A platform

Vidar Helgesen (Conservative Party of Norway), minister of European Economic Area (EEA) and EU affairs, has paid a visit to the Statoil-operated ‘Troll A’ platform, in the Troll field, located in the Norwegian part of the North Sea. The reason behind the visit was the start-up of the two new giant c

about 11 years ago

Advertisement

New Gear for Van Oord’s Dredger
Equipment

New Gear for Van Oord’s Dredger

Bakker Sliedrecht – specialized in the design, production, installation and maintenance of complex electrical installations – will be taking care of an electrical conversion project on board Van Oord’s trailing suction hopper dredger Volvox Terranova. The company recently received order for the engi

about 11 years ago
PSA Inspects Fabrication of Gina Krog Flexible Risers
Equipment

PSA Inspects Fabrication of Gina Krog Flexible Risers

The Petroleum Safety Authority Norway (PSA) has carried out an audit of Statoil and the fabrication of flexible risers for Gina Krog FSO. The objective of the audit was to monitor the fabrication of flexible risers, follow up the operator and supplier/subcontractor and verify that the project is bei

about 11 years ago
Picture of the Day: Hector in Norway
Equipment

Picture of the Day: Hector in Norway

The Oslo Fairway dredging project, undertaken by a Finnish dredging equipment manufacturer and contractor, Wasa Dredging, is currently underway. The company has just released this beautiful photo from this dredging program, which shows their backhoe giant Hector during the deepening work. About 89.0

about 11 years ago
Gallery: Helideck installation on Ivar Aasen Living Quarters
Equipment

Gallery: Helideck installation on Ivar Aasen Living Quarters

Det norske oljeselskap AS, the operator of the Ivar Aasen field in the North Sea, has shared images of a helideck being lifted on top of the Living Quarters (LQ) for the Ivar Aasen platform, being built by Apply Leirvik in its construction site in Stord, Norway. According to Det norske, it took thre

about 11 years ago