
Smulders has sent off the final three upper jackets for the Moray East offshore wind farm from its yard in Hoboken, Belgium, to Newcastle upon Tyne. Smulders will deliver 55 turbine jacket foundations for the project, with the remaining 45 being delivered by Lamprell from its yards in the United Ara

A tailormade subsea drill that will be used to install XL-monopile foundations at the Saint-Nazaire offshore wind farm has been commissioned after passing Factory Acceptance Tests on 30 September. The drill, jointly designed by DEME Offshore and Herrenknecht, will be deployed at the French offshore

The construction has started on the world’s largest floating offshore wind farm, Hywind Tampen, at Kværner Stord in Norway, Equinor said. Norway’s Prime Minister Erna Solberg and Kværner apprentice Arne Linga started the cutting robot on the project’s first sheet of steel on Thursday, 1 October. Kvæ

The UAE-based Lamprell has cut the first steel and has started building jacket foundations for the Seagreen offshore wind project. Back in June, Seaway 7 selected Lamprell to manufacture and deliver 30 turbine jacket foundations for the Scottish offshore wind farm. Lamprell said that the company had

The Iberdrola-led international consortium has launched the FLAGSHIP project to develop and fabricate the first 10+ MW floating offshore wind turbine. The turbine will be supported by a floating semi‐submersible concrete structure based on Olav Olsen’s OO-Star Wind Floater concept. The prototype is

Bladt Industries has completed the load out of the first transition pieces (TPs) for the Hornsea Two offshore wind farm at its facilities in Aalborg. In mid-September, the company carried out the load-out of the first six anode cages built for the 1.4 GW offshore wind project, saying the first six t

DEME Group’s jack-up vessel Innovation is set to begin the monopile installation at the Hornsea Two offshore wind project next month. In total, 165 monopiles and transition pieces will be installed at the offshore site in the UK in preparation for the Siemens Gamesa 8.4 MW turbines. With a height fr

Seajacks Scylla installed the 33rd jacket foundation at the Moray East offshore wind farm site on 20 September, according to the project’s Notice of Operations from 21 September. The jack-up vessel is transporting the jacket foundations to the project site from Global Energy Group’s site in Nigg. Th

Sea and Land Project Engineering (SLPE) has won a contract to provide the turbine foundation concept design for the Inch Cape offshore wind project in Scotland. According to SLPE, the project site has varying seabed depths and ground conditions making it one of the most complex in Europe. This is sa

The first three floating foundations built by the Navantia-Windar consortium for the Kincardine offshore wind farm are ready to be loaded out from Navantia’s yard in Fene, Spain. The first of the wind farm’s five floating foundations will be loaded onto Boskalis’ semi-submersible heavy transport ves

Aarsleff BIZ, a Per Aarsleff company, has loaded out the first batch of concrete work platforms (CWPs) for the Windpark Fryslân nearshore wind farm in the Netherlands at its factory in Swinoujscie, Poland. The CWPs, each weighing 76 tonnes, will be mounted on the project’s monopiles, which are curre

EnBW and aerodyn engineering have started testing the scaled-down version of the Nezzy² floating wind turbine in Greifswald Bay in the German Baltic Sea. The 18 metre tall, 1:10-scale prototype consists of two wind turbines on a floating platform made of precast concrete elements. The prototype was

SeAH has signed an exclusive Memorandum of Understanding with Able UK to use the Able Marine Energy Park development to establish a monopile production facility on the South Bank of the Humber. The South Korean steel tube manufacturer’s facility could potentially create around 400 jobs. Currently, t

Seaway 7 has selected COOEC-Fluor Heavy Industries to manufacture and deliver jackets and suction caissons for the Seagreen 1 offshore wind project. COOEC-Fluor’s scope of work for Seagreen 1 includes the fabrication and load-out of the suction caisson jackets. The manufacturing work will be carried