FPSO & Vessels

Aker BP, Aker Solutions and Subsea 7 kick off construction work for oil & gas project off Norway
Aker BP, Aker Solutions, and Subsea 7 have started the work on the first of three seabed installations for huge oil & gas projects.

Construction of BW Offshore’s Australia-bound FPSO remains on track
BW Offshore is continuing to make progress on the construction of an FPSO, which is destined to work on a gas field offshore Australia.

Eni brings African oil & gas field on stream less than two years after discovery
Eni has started production from an oil and gas field offshore Côte d’Ivoire less than two years after the discovery in September 2021.

BW Offshore secures $200 million financing for North Sea FPSO
BW Offshore has signed a new $200 million facility, refinancing its existing senior secured credit facility for an FPSO working in the UK.

Another FPSO put into production off Brazil
A second of two FPSOs that are part of Petrobras’ revitalisation project in the Campos Basin offshore Brazil has started production.

Dyna-Mac pursuing ‘win-win’ opportunities in FPSO module fabrication and carbon capture and storage
Dyna-Mac is teaming up with two firms to pursue CCS projects and enable more flexibility in addressing spikes in FPSO module fabrication demand.

Eni prolongs BW Offshore FPSO’s assignment off Nigeria
Eni has awarded another short-term contract extension to BW Offshore for one of its FPSOs, which is working on a field off Nigeria.

‘Small defect’ identified after Australian FPSO shutdown following gas alarm
Jadestone Energy has found the location of a small defect after it temporarily shut in production from an FPSO off Australia.

Two FPSOs still on track for first oil by year-end
SBM Offshore has put its back into several FPSO projects while two of these are still scheduled to achieve the first oil by the end of 2023.

Australian FPSO goes offline once again
Jadestone Energy has temporarily shut in production from an FPSO vessel operating at a field in the Timor Sea offshore Australia.

Third well comes online as Borr rig starts drilling fourth one off Gabon
Oslo-listed oil and gas E&P player BW Energy has started production from the third well in its multi-well programme offshore Gabon.

Brazilian field revitalisation campaign in full swing as well comes online ahead of schedule
PRIO has kicked off production nearly a year ahead of schedule from a well located at a field off the coast of Brazil.

FPSO off Gabon sports new gas lift compressor
BW Energy has installed and started using a new gas lift compressor (GLC) on an FPSO, which is working on a project offshore Gabon.

With FPSO requiring more work, first oil gets bumped to mid-2024
Woodside has revised its cost estimate and timeline for the first oil from the first phase of Senegal’s first offshore oil development.