The energy potential of the North Sea is to play a crucial role in the energy transition facing North-West Europe and can create between EUR 100 billion and EUR 200 billion in value by 2050, according to a report by the World Energy Council Netherlands (WEC).
Energy recruitment agency ERSG has won an exclusive contract to supply platform and cable client representatives for TenneT’s projects for the Dutch offshore grid system.
Offshore wind levelized costs will slide 71% by 2040, according to the latest long-term forecast from Bloomberg New Energy Finance (BNEF).
ABB has commissioned and delivered the DolWin2 offshore wind transmission link to the Dutch-German transmission system operator TenneT.
DEME Group’s offshore wind division is looking into the possibility of using drones to inspect the foundations of the offshore wind turbines for corrosion.
DNV GL has announced its latest Joint Industry Project (JIP), aiming to optimise the performance of wind farms by reducing the downtime and lower the costs of energy during the operational project life span of 25 years or more.
The NKT Victoria cable-laying vessel has successfully laid the first HVDC cables in the Moray Firth as part of Scottish and Southern Electricity Networks’ GBP 1.1 billion Caithness-Moray transmission project.
More insights into the worldwide supply chain and a wider selection of companies and organizations: the 2017 version of the online Offshore WIND International Business Guide promises to take the reference guide to the next level.
The Newfoundland and Labrador Environmental Industry Association (NEIA) has released a study identifying the supply chain associated with offshore wind energy development, and analyzing the capacity within this Canadian province to meet development requirements.
The Newfoundland and Labrador Environmental Industry Association (NEIA) has released a study identifying the supply chain associated with offshore wind energy development, and analyzing the capacity within this Canadian province to meet development requirements.
The Offshore Wind Innovation Exchange (OWiX) has announced the opening of a Call for Ideas for its first four innovation challenges, as identified by key players in the offshore wind industry.
Belgian transmission system operator Elia has invited tenders for unexploded ordnance (UXO) survey, identification and removal on the cable route of the Modular Offshore Grid (MOG) project in the Belgian sector of the North Sea.
Bureau Veritas has been awarded a contract for certification of the floating wind array to be deployed between the Groix and Belle-Ile Islands in France.
Bureau Veritas has been awarded a contract for certification of the floating wind array to be deployed between the Groix and Belle-Ile Islands in France.