Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Operations & Maintenance

Loading filters...
Offshore WindPorts & LogisticsResearch & DevelopmentTechnologySubseaBusiness & FinanceEquipmentMarine EnergyProject & TendersAuthorities & Government
Ørsted Testing Hybrid CTV at Horns Rev 2
Operations & Maintenance

Ørsted Testing Hybrid CTV at Horns Rev 2

Ørsted is testing a Surface Effect Ship, a hybrid crew transfer vessel (CTV) between a hovercraft and a catamaran, on the route from Esbjerg Port to the Horns Rev 2 offshore wind farm in the Danish North Sea, Umoe Mandal said.

about 8 years ago
Ørsted Testing Hybrid CTV at Horns Rev 2
Operations & Maintenance

Ørsted Testing Hybrid CTV at Horns Rev 2

Ørsted is testing a Surface Effect Ship, a hybrid crew transfer vessel (CTV) between a hovercraft and a catamaran, on the route from Esbjerg Port to the Horns Rev 2 offshore wind farm in the Danish North Sea, Umoe Mandal said.

about 8 years ago
Ecosse Subsea Systems Adds 800-Ton Carousel
Operations & Maintenance

Ecosse Subsea Systems Adds 800-Ton Carousel

Ecosse Subsea Systems (ESS) has reached an agreement with an undisclosed subsea contractor to buy back their 800-ton carousel which can be deployed on a range of specialist subsea projects. The carousel was originally built and used on an offshore renewables project in 2014 after ESS identified a su

about 8 years ago
WG Columbus Completes Gardarbank High Seismic Shoot for NPD
Operations & Maintenance

WG Columbus Completes Gardarbank High Seismic Shoot for NPD

The Norwegian Petroleum Directorate (NPD) has finalized acquisition of about 4,500 kilometers of 2D seismic data on the Gardarbank High, offshore Norway. The WesternGeco’s vessel WG Columbus acquired the seismic data. “The operation was very successful; progress was good and we were able to acquire

about 8 years ago
STORM spawns novel wave energy connector
Operations & Maintenance

STORM spawns novel wave energy connector

A new multi-material connector for wave energy devices has been unveiled at London’s Brunel University.

about 8 years ago
Kreuz Subsea Lands Historic Deal with L&T
Operations & Maintenance

Kreuz Subsea Lands Historic Deal with L&T

Kreuz Subsea said it has been awarded its most financially significant contract in the company’s history. It will see the firm mobilise five vessels to deliver subsea completion works for Larsen & Toubro (L&T) from the start of 2018. The contract, which is worth an undisclosed eight-figure sum, will

about 8 years ago
Reservoir Link Bags Petronas Award
Operations & Maintenance

Reservoir Link Bags Petronas Award

Reservoir Link has received a conditional letter of award (LOA) from Petronas, for the provision of annulus wash and cementing assurance (AWCA) services. The scope of work includes circulation tunnel creation, wash technology and multi-annulus cement placement for approximately 74 wells offshore Mal

about 8 years ago
Nova Scotia examines dry ports to support tidal energy
Operations & Maintenance

Nova Scotia examines dry ports to support tidal energy

The Offshore Energy Research Association (OERA) has launched a request for proposals for a study into the viability of using dry ports to support tidal energy developments in Nova Scotia.

about 8 years ago
Aqueos Supports Pipeline Installation Project in Gulf of Mexico
Operations & Maintenance

Aqueos Supports Pipeline Installation Project in Gulf of Mexico

Subsea Services provider Aqueos Corporation has been awarded a contract from an international contractor for a pipeline installation project located in the Gulf of Mexico. The contract, which started in December 2017 and will be completed in the first half of 2018, will support shallow-water pipelin

about 8 years ago
EMEC endorses MaRINET2 testing chance
Operations & Maintenance

EMEC endorses MaRINET2 testing chance

The European Marine Energy Centre (EMEC) has encouraged ocean energy developers, supply chain companies and research organizations to apply for access to the center’s test facilities in Scotland.

about 8 years ago
Kriegers Flak Foundations En Route to Denmark
Operations & Maintenance

Kriegers Flak Foundations En Route to Denmark

Two foundations of 10,000 tonnes and 8,000 tonnes, destined for the Danish offshore wind farm Kriegers Flak, have left the port of Ostend in Belgium. According to Jan de Nul, the foundations are planned to arrive in Denmark on January 15, 2018, where, depending on the weather conditions, the first f

about 8 years ago
Flexlife Scores Riser Monitoring Deal in GoM
Operations & Maintenance

Flexlife Scores Riser Monitoring Deal in GoM

Flexlife has been selected to design, supply and install FlexSentinel monitoring systems for three floating production platforms in the Gulf of Mexico. The systems will provide annulus monitoring for six flexible risers. FlexSentinel annulus monitoring system provides real-time data, trending and al

about 8 years ago
Video: Ocean energy adaptive management 101 with ETIP Ocean
Operations & Maintenance

Video: Ocean energy adaptive management 101 with ETIP Ocean

The European Technology and Innovation Platform for Ocean Energy (ETIP Ocean) has released a recording of the webinar dedicated to adaptive management systems for ocean energy.

about 8 years ago
Nautilus Inks Bridge Loans and Funding Mandate Deal
Operations & Maintenance

Nautilus Inks Bridge Loans and Funding Mandate Deal

Nautilus Minerals has arranged to receive bridge loans from Deep Sea Mining Finance, and has also entered into a funding mandate agreement with M. Horn & Co.. The bridge loans, which the company expects to be in the amount of up to US$7 million, will assist the company’s immediate working capital re

about 8 years ago
  • 1
  • …
  • 499
  • 500
  • 501
  • …
  • 1595