Project & Tenders
Mid-Breton Contractor Selected
Louisiana’s Coastal Protection and Restoration Authority (CPRA) selected the Louisiana Diversion Company (LDC) to provide Construction Management At-Risk (CMAR) services for the Mid-Breton Sediment Diversion Project, the agency announced Monday. The CMAR model integrates the construction contractor
Reach Subsea Scoops Up New Contracts
Norwegian contractor Reach Subsea said it has recently been awarded subsea survey and inspection contracts for the 2019 summer season. The contracts have a combined firm value of approximately NOK 70 million (approximately $8.1 million). The Oslo-listed firm added that these contracts also contain o
Manor Provides Hohe See Power Kit
Manor Renewable Energy (MRE) has secured a contract with EnBW to provide a temporary power package for the turbine installation phase of the Hohe See offshore wind project. MRE said it started providing a full temporary power package of generators, personnel and vessels in the German North Sea this
TechnipFMC Lands Lapa Subsea Deal Offshore Brazil
TechnipFMC has been awarded a significant contract, in value between $75 million and $250 million, for Lapa field by Total E&P do Brasil (Total). Total awarded the contract on behalf of the Lapa Field Consortium, comprised of Total (35%), Shell Brasil Petróleo (30%), Repsol Sinopec Brasil (25%) and
NPD Hires Shearwater for Barents Sea Shoot
Shearwater GeoServices has been awarded a contract for a Barents Sea seismic acquisition survey with full data processing by the Norwegian Petroleum Directorate (NPD). Shearwater’s Reveal software, which the NPD uses in-house, will be used for full onboard and onshore processing enabling close colla
Santos to drill second Dorado well in May
Santos and Carnarvon have announced their plans for the appraisal of the world-class Dorado offshore oil discovery in Western Australia.
WIND Executes Subsea Cable Move for ZTT
Dutch provider of logistics services for subsea cables, WIND, has completed its latest full scope cable transport project with the transfer of 26 km of 155kV subsea cable in the port of Eemshaven. The cable is for delivery to a large European TSO and will be used to connect an offshore wind farm to
Hydro Group Appoints Japanese Distributor
Hydro Group has established a new partnership with Japanese electrical and optical products company Riken Dengu Seizo, who will become its official distributor in Japan. The Tokyo-headquartered firm will be the official distributor and business partner for Hydro Group’s subsea connectivity product r
Zennor Petroleum: Finlaggan ‘firmly on track’
Oil and gas company Zennor, developing the Finlaggan field in the UK North Sea, is making progress at the project as offtake deals have been confirmed and production wells have been successfully drilled.
Milestone Reached on Boston Harbor Navigation Project
The U.S. Army Corps of Engineers, New England District reached the milestone on April 5, 2019 of removing 4 million cubic yards of dredge material as part of Phase II of the three-phased Boston Harbor Navigation Improvement Project in Massachusetts. According to the Corps, approximately 7.7 million
SEAMOR Marine ROV for ‘Last Ice Project’ in Canada’s Arctic
SEAMOR Marine has been selected as the provider of a remotely operated vehicle (ROV) to the department of Fisheries and Oceans Canada in Manitoba. The vehicle will be deployed to the High Arctic to inspect the area which remains frozen year-round and take part in research and evaluating ways to prot
Tokyo Gas inks LNG supply deal with Shell
Japanese utility Tokyo Gas has executed a heads of agreement (HOA) with Shell Eastern Trading for the supply of liquefied natural gas (LNG).
Damen Marine Components Bags Turkish Order
Damen Marine Components (DMC) has signed its first order with a Turkish Shipyard, the TERSAN Tersanecilik, based at Yalova City on the Sea of Marmara. The order is for the equipment that will be installed on a 108-meter Factory Freezer Trawler vessel, designed by Skipsteknisk, being built for the Ru
Lavallette Beach Replenishment Project Almost Done
Weeks Marine dredgers RN Weeks and Magdalen are just one step away to complete the Lavallette beach replenishment project. According to the Corps, the two dredgers are pumping sand near the Ortley, White, Kerr, Bond, Guyer avenues with only few blocks to go before Lavallette beach replenishment proj