Foreign Secretary William Hague visited Baku today to witness the signing of the final investment decision on a new gas development led by BP, which consolidates the UK’s position as the largest foreign investor in Azerbaijan. The Shah Deniz 2 gas deal will secure a greater diversity of gas supply t
As result of the Unexploded Ordnance (UXO) threat identified from successful route survey for Tennet Offshore Gmbh, MMT will perform stage II in the marine UXO survey program for the HelWin 2 project. The magnetometer targets and side scan sonar targets that were picked from geophysical survey (stag
Australian energy company WHL Energy Limited announces the La Bella 3D seismic survey has been completed and that the specialist seismic acquisition vessel CGG Viking II is demobilising from the survey area. The survey has been completed with no reportable incidents and within budget, despite the ch
NOAA Fisheries announced final regulations requiring the United States Navy to implement protective measures during training and testing activities off the coasts of California and Hawaii and on the high seas of the Pacific Ocean to reduce the effects on marine mammals. The Navy requested an authori
Pharos Offshore acquired an SMD built 1200HP cable burial tool in July 2013, since then the vehicle has undergone extensive modifications that have enhanced the configuration to provide a more effective post lay/ installation burial vehicle. Modifications to the vehicle have been made at the Tees Of
Statoil ASA has together with partners in the Shah Deniz consortium in Azerbaijan today made a final investment decision for the stage 2 development of the Shah Deniz gas field in the Caspian Sea offshore Azerbaijan. Statoil also enters an agreement to divest a 10% share of its 25.5% holdings in Sha
An international team of researchers report that sea level rise since the industrial revolution has been fast by natural standards and – at current rates – may reach 80 centimetres above the modern level by 2100 and 2.5 metres by 2200. The team used geological evidence of the past few million years
A joint British-German team has returned from a five-week research expedition, mapping and sampling a giant submarine canyon off northwest Morocco. The expedition was on the German research vessel, Maria S Merian. Dr Russell Wynn of the National Oceanography Centre led the British contribution to th
Blade Dynamics has announced that the design phase of their ‘Very Long Blade Project’ for the Energy Technologies Institute (ETI) has successfully concluded and that the prototyping phase will now begin. Blade Dynamics will now assemble an approximately 80-metre long blade prototype, and will begin
Recently, scientists have described what is being called the largest volcano on the planet. In an article in the journal Nature Geoscience, Dr. William Sager and his coauthors present evidence from multichannel seismic and core data indicating that the province known as the Tamu Massif is a shield v
One year ago, Service Hydrographique et Océanographique de la Marine (SHOM) set up a pilot project at their cartography department with five cartographers for the implementation of the CARIS Hydrographic Production Database (HPD) suite tools. Tests were conducted for paper chart and Electronic Navig
Researchers from Plymouth University (UK) conducted a marine geoarchaeological survey off Methoni, Greece. The Kongsberg GeoAcoustics Dual Frequency Side Scan Sonar and the GeoPulse Pinger Sub-Bottom Profiler were used for visualisation of underwater antiquities over the local underwater archaeologi
International Association of Geophysical Contractors President Chip Gill today issued the following statement on the announcement by Norwegian Oil and Gas and Statoil of a joint seismic acquisition project in the Barents Sea: “On December 10th, Norwegian Oil and Gas and Statoil announced a group of
TAQA, the international energy company from Abu Dhabi, has received approval from the UK government for development of its Morrone field (block 9/23b) in the Central North Sea. The initial phase of development will consist of an extended reach well drilled from the TAQA-operated Harding platform whi