The International Marine Contractors Association (IMCA) has launched its pilot Continuing Professional Development (CPD) scheme for diving supervisors. The App based scheme is said to incorporate the very latest in training techniques and is available in IOS, Android, tablet and PC formats. Trials o
JFD has launched a safety upgrade to its Stealth rebreathers range that should reduce the potential for incidents when switching to bail-out gas during mine countermeasures and explosive ordnance disposal (MCM-EOD) operations, as well as other underwater missions. The new dual mode bite mouthpiece i
The U.S. Senate Committee on Appropriations has advanced the fiscal year 2020 energy and water funding bill, which includes support for the Aqua Ventus demonstration offshore wind project. The legislation, advanced by a vote of 31-0, includes provisions led by Senator Susan Collins to support severa
The second phase of an Innovate UK project has been launched to develop an automated fouling management system for the marine energy industry. The 24-month RoBFMS (Robots to Inspect, Maintain and Repair in Extreme and Challenging Environments) project will develop an automated robotic system to moni
The second phase of an Innovate UK project has been launched to develop an automated fouling management system for the marine energy industry. The 24-month RoBFMS (Robots to Inspect, Maintain and Repair in Extreme and Challenging Environments) project will develop an automated robotic system to moni
SSE Renewables is set to conclude decommissioning of the Hunterston National Offshore Wind Turbine Testing Facility in Scotland with the controlled felling of the remaining turbine. The original intention was to dismantle the components of the Siemens 6MW turbine by crane. However, a suitable method
SSE Renewables is set to conclude decommissioning of the Hunterston National Offshore Wind Turbine Testing Facility in Scotland with the controlled felling of the remaining turbine. The original intention was to dismantle the components of the Siemens 6MW turbine by crane. However, a suitable method
Woodside has signed a Shareholders Agreement with Perth-based Blue Ocean Monitoring (BOM) to invest in Blue Ocean Seismic Services (BOSS). BOSS is developing an innovative solution that has the potential to make ocean bottom seismic data acquisition cheaper and more accessible, the company said. Sei
Swansea-based Marine Power Systems (MPS) project to create and launch an underwater device capable of generating clean, affordable and reliable energy has been awarded more than £12 million of EU funding, First Minister Mark Drakeford announced. The WaveSub device is the invention of Swansea Univers
The US Department of Energy (DOE) Water Power Technologies Office (WPTO) will hold its Project Peer Review October 8–10, 2019, in Alexandria, Virginia. The purpose of the Project Peer Review is to evaluate projects funded by DOE based on their contribution to the mission and goals of the office, to
Tritech, a Moog company, has released the Gemini 1200ik Dual Frequency sonar – the latest addition to its Gemini range. The multibeam imaging sonar offers two operational frequencies with the ability to switch between low and high frequency dependant on the user’s requirement. The 720 kHz low freque
The Floating Wind Joint Industry Project (JIP) has launched the Floating Wind Technology Acceleration Competition to accelerate the development and commercialisation of floating wind. The Carbon Trust, the project lead, together with 14 offshore wind developers represented by the Floating Wind JIP,
SMRU Consulting has been monitoring marine mammals around marine renewable energy projects since 2006. Their experience includes the SeaGen device in Northern Ireland at (the world’s first grid connected tidal turbine), the DeltaStream device in Wales, the MeyGen array in northern Scotland (the worl
Trendsetter Engineering has been awarded a contract for the design, qualification and delivery of a 20K Hydraulic Intervention Connector by HWCG. The 20K connector is designed to interface with the HWCG 20K Capping Stack and would be utilized to conduct flowback or intervention operations after the