Sustainable Marine Energy (SME) has assembled its PLAT-I floating tidal energy platform ahead of upcoming trials in Connel Sound in Scotland.
Nexans has opened a new high voltage test laboratory at its Calais Center of Excellence in France, making it fully operational with the capacity to test cable systems up to 1.5 million volts.
Great Yarmouth-based ATAM Group has tested its robotic crawler, developed for the inspection of wind turbine blades, on the full-size turbine training tower and along test blades at ORE Catapult’s facilities in Northumberland, which is offered as part of a GBP 50,000 grant awarded to ATAM from the G
The works on the installation of the Bourne tidal test site in Massachusetts’ Cape Cod Canal have been completed.
The Welsh government is looking to commission a contractor to conduct tidal and wave research work in support of the Welsh National Marine Plan.
East Coast Oil and Gas Engineering (EC-OG) has completed the testing program for its Subsea Power Hub hybrid unit at the European Marine Energy Centre (EMEC) in Orkney.
The initial phase of the MeyGen tidal energy project has won an award for its tidal turbine support structures at this year’s Structural Awards.
Lloyd’s Register (LR) has assessed Fistuca’s BLUE Hammer technology showing that it has the potential to produce “far less” underwater noise during the installation of offshore wind foundations compared to hydraulic hammers.
Deutsche WindGuard Wind Tunnel Services has developed a special wind tunnel for LiDAR Calibration on behalf of the National Metrology Institute of Germany (Physikalisch-Technische Bundesanstalt – PTB).
Deutsche WindGuard Wind Tunnel Services has developed a special wind tunnel for LiDAR Calibration on behalf of the National Metrology Institute of Germany (Physikalisch-Technische Bundesanstalt – PTB).
The government of Canada has put in motion a C$155 million ($121 million) program that will fund clean technology projects in the area of energy and other sectors to help reduce greenhouse gas emissions.
German-based power cable provider NKT is testing the new set of cables in Waves4Power’s wave energy project in Norway as it looks to take a share in the emerging wave power market.
Ørsted has invited comments on the proposed modifications to the onshore and offshore export cable corridor for the Hornsea Project Three wind farm located some 120 kilometres off the north Norfolk coast, UK.
Atlantis Resources has signed heads of terms with the Duchy of Lancaster for an option for the long-term lease of the riverbed required to develop the Wyre estuary tidal barrage and flood protection project.