Onshore works for the Hornsea Project One wind farm are scheduled to start this month with the construction of an onshore substation at North Killingholme, North Lincolnshire. This will be followed by burying an onshore cable underground and works around the landfall site where the onshore cable mee
HiDef Aerial Surveying Limited (HiDef) will carry out aerial surveys for one of National Grid’s latest projects. National Grid will provide a connection to the electricity transmission network for the proposed new 3.4GW nuclear power station, Moorside, in West Cumbria and export energy produced by a
New Jersey may have lost the race to build the first offshore wind facility in the nation, but the potential for offshore wind power production is still highest off the Jersey Shore, according to a new report by Environment New Jersey Research and Policy Center report. Using data from the US Nationa
New official statistics from UK’s National Grid show that 2015 was a record year for wind energy generation, with onshore and offshore wind farms supplying their largest ever amounts of clean electricity to Britain’s homes, factories and offices, according to RenewableUK. Overall, 11% of the UK’s el
NIRAS and Intertek have been appointed by Energinet.dk and National Grid Viking Link Limited as marine consultants to assist with the permitting of Viking Link, a proposed high voltage direct current (HVDC) interconnector between Great Britain and Denmark. Betina Heron, Executive Director for Enviro
The Offshore WIND staff thought that the New Year’s Day would be the perfect time to let you – our readers – be editors and compile a list of news you found the most interesting and worth a read in 2015. DONG Energy Seeks Technical and Consultancy Staff for Danish Projects DONG Energy has invited te
The Offshore WIND staff would like to wish all our readers a happy, prosperous, and offshore wind-powered 2016! Happy New Year! Image source: Marc Pearce
2015 has been a momentous year for the offshore wind industry, and creating a list of highlights is not an easy task. However, after much deliberation, our editors have compiled a subjective overview of significant changes in the offshore wind landscape in 2015. DONG to Build World’s Biggest Offshor
With 2016 fast approaching, Offshore WIND staff have today compiled a list of the five most popular videos in 2015. Take a look of what was watched the most in the year coming to an end. Behind the Offshore Wind Maintenance Scene During high waves, storm and hail, André Carstens goes out to sea to m
Umoe Ventus Sinks After Catching Fire off Langeland The Wave Craft Surface Effect Ship Umoe Ventus sank yesterday after catching fire off Langeland, while en route to Bagenkop, according to local media and the police. German Offshore Wind Farms Over 6 Times Busier in 2015 Germany’s offshore wind far
The Dutch Minister of Economic Affairs Henk Kamp must act quickly to take out the provisions related to offshore wind power generation from the recently rejected STROOM bill, and run them through both Houses of Parliament via a new draft bill to minimise the delays in the Borssele I & II offshore wi
Following the Dutch Senate’s decision to dismiss the ‘Stroom’ bill, TenneT said that it will work with the Ministry of Economic Affairs to come up with a customized schedule as soon as possible, since the first grid connection of wind farms in the waters off Borssele will now be delayed. Mel Kroon,
Stavanger-based subsea company Ocean Installer has been awarded an offshore wind contract with Norddeutsche Seekabelwerke GmbH. The scope of work includes recovery of two pre-laid HVAC export power cables in the 500 m zone of the Gode Wind 1 offshore sub-station, relay of the cable, installation of
The subsea cable linking Dong Energy’s 209 MW Horns Rev 2 offshore wind farm with Denmark’s onshore grid was repaired and put back into operation on 18 December, nearly two months after the fault was reported, Energinet.dk said. The faulty cable put the wind farm out of operation on 19 October. One