Storage
Germany: Sandbank Offshore Wind Seeks Substation Design, Installation
Sandbank Offshore Wind GmbH is looking for contractors for offshore wind farm works. The whole project consists of 96 WTGs, WTG foundations, Inter Aray cables and an Offshore Substation (OSS). The windfarm is located in the German Bight, 90 km west of the island of Sylt, in the German Exclusive Econ
Germany: DC Netz Needs Offshore Wind Farm Contractors for Two Projects
DC Netz BorWin5 GmbH is seeking contractors for 2 separate windfarm projects – BorWin5 and DolWin4. BorWin5: System for transmission of electric power (approximately 900 MW) between offshore wind farms in the cluster BorWin and a grid connection point on land. In particular, the transmission power,
Germany: TenneT Seeks Subsea Cable Contractor
TenneT Offshore GmbH is seeking contractors for manufacturing, supply and installation of AC submarine cables, including fibre optics. Subsea cabling will be done in the region of the cluster SylWin, designed for a transmission capacity of up to 300 MW per wind farm and a power level of about 155 kV
Germany: TenneT Seeks Subsea Cable Contractor
TenneT Offshore GmbH is seeking contractors for manufacturing, supply and installation of AC submarine cables, including fibre optics. Subsea cabling will be done in the region of the cluster SylWin, designed for a transmission capacity of up to 300 MW per wind farm and a power level of about 155 kV
Belgium: Jan de Nul Orders Caley Ocean Systems’ Turntable
Offshore handling systems specialist, Caley Ocean Systems, has been awarded a contract to supply leading dredging and marine engineering company, Jan de Nul NV, with a 5,400Te capacity cable turntable for the MPV Willem De Vlamingh. Mid 2013, Jan de Nul is installing 245kV export cable connecting th
Offshore Wind Farm to Connect Anholt Island to Danish Grid
For the approximately 160 residents on Anholt, Anholt Offshore Wind Farm means that from 2014, the island will be connected to the Danish grid via the offshore wind farm. Energinet.dk will lay a 28km long submarine cable from the substation in Anholt Offshore Wind Farm to the island in the Kattegat.
Offshore Wind Farm to Connect Anholt Island to Danish Grid
For the approximately 160 residents on Anholt, Anholt Offshore Wind Farm means that from 2014, the island will be connected to the Danish grid via the offshore wind farm. Energinet.dk will lay a 28km long submarine cable from the substation in Anholt Offshore Wind Farm to the island in the Kattegat.
UK: Carbon Trust to Conduct Offshore Wind Cable Study
Carbon Trust is planning to conduct the offshore wind cable study. A significant number of UK offshore wind farms have experienced difficulties associated with the installation and burial of intra-array cables. In 2011, the OWA commissioned a study to develop recommendations for optimised cable inst
Switzerland: ABB Announces New Technology to Enable Future DC Grid
ABB, the leading power and automation technology group, announced a breakthrough in the ability to interrupt direct current, solving a 100-year-old electrical engineering puzzle and paving the way for a more efficient and reliable electricity supply system. After years of research, ABB has developed
GWFL Withdraws Application to Compulsorily Acquire EDF’s Land in Suffolk, UK
Galloper Wind Farms Limited (GWFL) has withdrawn its application under section 127 of the Planning Act 2008, to compulsorily acquire land currently owned and required by EDF Energy for the proposed Sizewell “C” nuclear power plant. GWFL, as part of its plans for the Galloper Wind Farm project, requi
Cable Installation Complete at London Array, UK
Six days after the final foundation was installed at London Array the project has achieved another milestone – all array cables have now been installed at the offshore site. The installation of the last array cable was completed on Thursday 25th October by the The Normand Flower. 187 cables have bee
Cable Installation Complete at London Array, UK
Six days after the final foundation was installed at London Array the project has achieved another milestone – all array cables have now been installed at the offshore site. The installation of the last array cable was completed on Thursday 25th October by the The Normand Flower. 187 cables have bee
Germany: Trianel Seeks Compensation for Grid Connection Delays
TenneT TSO GmbH got a lawsuit because of the grid connection delays on Trianel’s 200 MW North Sea offshore wind farm. Namely, Trianel is seeking compensation for the Borkum offshore wind farm related costs, which will increase from EUR 50 million to at least EUR 900 million, Bloomberg informs. The d
UK: Forewind to Host Meeting on Dogger Bank Onshore Electricity Infrastructure
Forewind will this week host the third meeting of the community working group that has been established to assist with the siting of the onshore electricity infrastructure for the proposed Dogger Bank Creyke Beck offshore wind development. Following on from meetings held in March and May, this meeti