Advertisement

Storage

Inter-Array Cable Burial Underway at Deutsche Bucht
Storage

Inter-Array Cable Burial Underway at Deutsche Bucht

Van Oord has deployed its trencher Dig-It to bury the laid inter-array cables at the Deutsche Bucht offshore wind farm in Germany. The inter-array cables are being buried at the required depth of 1.5m below the seabed at the 269MW project, Van Oord said. The Dutch company reported that its cable lay

about 7 years ago
Ideol and AOL Present Market-Ready Floating Substation
Storage

Ideol and AOL Present Market-Ready Floating Substation

Ideol and Atlantique Offshore Energy (AOE) have unveiled the details of their market-ready universal floating offshore substation. Developed in cooperation with ABB, the floating offshore substation is designed for both bottom-fixed and floating offshore wind farms starting at depths of 40 metres. I

about 7 years ago
Highlights of the Week
Storage

Highlights of the Week

MarineEnergy.biz has compiled the top news from marine energy industry from May 27 – June 02, 2019. https://marineenergy.biz/2019/05/29/oceanbased-snmrec-work-on-new-ocean-current-energy-project/ https://marineenergy.biz/2019/05/31/minesto-clinches-e14-9m-eu-grant-through-welsh-govt/ https://marinee

about 7 years ago
DolWin6 Coating Ordered from Spain
Storage

DolWin6 Coating Ordered from Spain

Gaditana de Chorro y Limpieza has won a contract to carry out coating works on the DolWin6 grid connection in the German North Sea. The Spanish company is in charge of the surface preparation and coating application of the offshore substation, jacket foundation, bridge connection, and offshore hook-

about 7 years ago
NYPSC Seeks Public Comment on South Fork Grid Link
Storage

NYPSC Seeks Public Comment on South Fork Grid Link

The New York Public Service Commission (NYPSC) is seeking public comment on a proposed electric transmission line which would connect the South Fork offshore wind farm to the state’s grid. Deepwater Wind South Fork, LLC, a subsidiary of Ørsted, is seeking authorization to install an approximately 3.

about 7 years ago

Advertisement

Katapult Ocean Launches 2nd Call for Accelerator Programme
Storage

Katapult Ocean Launches 2nd Call for Accelerator Programme

The Katapult Ocean Accelerator Programme is looking for start-ups that provide solutions to the ocean challenges. Young tech companies, working with technology catering to aquaculture, fisheries, transport, offshore energy and ocean health are encouraged to apply for the Katapult Ocean Accelerator p

about 7 years ago
Formosa Inter-Array Cable Installation Impending
Storage

Formosa Inter-Array Cable Installation Impending

The installation of inter-array cables at the Formosa 1 Phase 2 offshore wind farm in Taiwan is scheduled to begin in June. Jan De Nul’s cable laying vessel Willem de Vlamingh will carry out the installation of 20 cables at the project site from 1 June to 30 September. The Luxembourg-based company i

about 7 years ago
Ireland and France Seek EU Financing for Celtic Interconnector
Storage

Ireland and France Seek EU Financing for Celtic Interconnector

Taoiseach (Irish Prime Minister) Leo Varadkar and President of France Emmanuel Macron have submitted a joint request to the European Commission seeking financial support for the Celtic Interconnector electricity link between Ireland and France. The Taoiseach and President Macron have co-signed a let

about 7 years ago
Ireland and France Seek EU Financing for Celtic Interconnector
Storage

Ireland and France Seek EU Financing for Celtic Interconnector

Taoiseach (Irish Prime Minister) Leo Varadkar and President of France Emmanuel Macron have submitted a joint request to the European Commission seeking financial support for the Celtic Interconnector electricity link between Ireland and France. The Taoiseach and President Macron have co-signed a let

about 7 years ago
Revolution Wind Gets Rhode Island Power Contract
Storage

Revolution Wind Gets Rhode Island Power Contract

The Rhode Island Public Utilities Commission has approved Ørsted and Eversource’s long-term power contract with National Grid for the 400MW Revolution Wind offshore wind project. According to Ørsted, the 400MW offshore wind farm will power more than 270,000 homes in Rhode Island, which is circa 25%

about 7 years ago

Advertisement

Revolution Wind Gets Rhode Island Power Contract
Storage

Revolution Wind Gets Rhode Island Power Contract

The Rhode Island Public Utilities Commission has approved Ørsted and Eversource’s long-term power contract with National Grid for the 400MW Revolution Wind offshore wind project. According to Ørsted, the 400MW offshore wind farm will power more than 270,000 homes in Rhode Island, which is circa 25%

about 7 years ago
Kraken Subsea Wins Kriegers Flak Contract
Storage

Kraken Subsea Wins Kriegers Flak Contract

Vattenfall has awarded Kraken Subsea Solutions with a contract for employer’s representation for the inter-array cable installation at the Kriegers Flak offshore wind project. The French engineering and consultancy company will provide supervision services to Vattenfall during the offshore installat

about 7 years ago
Highlights of the Week
Storage

Highlights of the Week

MarineEnergy.biz has compiled the top news from marine energy industry from May 20 – May 26, 2019. https://marineenergy.biz/2019/05/21/intermoor-takes-part-in-carnegies-wec-project/ https://marineenergy.biz/2019/05/22/marine-energy-alliance-supports-22-projects/ https://marineenergy.biz/2019/05/20/m

about 7 years ago
Akuo and Sabella Ink PHARES Pact
Storage

Akuo and Sabella Ink PHARES Pact

French companies Akuo Energy and Sabella have signed a co-development agreement for the PHARES project aimed towards energy autonomy of the Ushant Island. PHARES (Progressive Hybrid Architecture for Renewable Energy Solutions in islands) project, led by Akuo will see the deployment of a pilot tidal

about 7 years ago