Sparrows Group Cable and Pipe Lay Solutions (CPLS) division has delivered its largest renewables project through three contracts related to the 1.2GW Hornsea Project One offshore wind farm. The three contracts were awarded through Boskalis (formerly VBMS), DEME Offshore (formerly known as Tideway),
TELE-FONIKA Kable (TFKable) has conducted the first Factory Acceptance Test (FAT) of a 220kV onshore high-voltage cable for the UK’s Moray East offshore wind farm at its Bydgoszcz plant in Poland. The cable supplier informed via social media that it had successfully FAT-tested 1,600mm² and 2,000mm²
TELE-FONIKA Kable (TFKable) has conducted the first Factory Acceptance Test (FAT) of a 220kV onshore high-voltage cable for the UK’s Moray East offshore wind farm at its Bydgoszcz plant in Poland. The cable supplier informed via social media that it had successfully FAT-tested 1,600mm² and 2,000mm²
The Scottish Government has approved the onshore planning application for the Inch Cape offshore wind project. Inch Cape Offshore Ltd (ICOL) submitted the planning application in principle to East Lothian Council in March last year proposing the former Cockenzie Power Station site as the new locatio
UK-based Correll Services Ltd has secured a contract to provide subsea and land cable termination and testing works on the Formosa 1 Phase 2 offshore wind farm in Taiwan. The contract has been awarded by Formosa 1 project turnkey contractor Jan De Nul Group. Correll Services – a specialist in high v
The Belgium-based Marlinks has secured a contract for monitoring the cable burial depth of the Northwester 2 offshore wind farm. Marlinks will monitor the burial depth of six inter-array cables and one export cable, which will be equipped by the company’s distributed temperature sensing (DTS) measur
The Belgium-based Marlinks has secured a contract for monitoring the cable burial depth of the Northwester 2 offshore wind farm. Marlinks will monitor the burial depth of six inter-array cables and one export cable, which will be equipped by the company’s distributed temperature sensing (DTS) measur
The European Commission has approved, under the EU Merger Regulation, the acquisition of joint control over Diamond Transmission Partners by Diamond Transmission Corporation Limited (DTC) and by Infrared Capital Partners Limited (IRCP). Diamond Transmission Partners is the holding company of the Off
German transmission system operators (TSOs) have issued the first draft of the Grid Development Plan (GDP) 2030, which includes expanded offshore wind capacity scenarios. According to 50Hertz, Amprion, TenneT and TransnetBW, the expansion targets have been increased to 17GW in scenarios B and C 2030
Pfisterer has won a contract for the supply of the 220kV land cable accessories for the grid connection of the 950MW Moray East offshore wind farm in Scotland. The company won the contract in cooperation with the cable manufacturer TELE-FONIKA Kable and the international cable and pipeline installat
Polish grid operator Polskie Sieci Elektroenergetyczne (PSE) has specified the connection conditions for the Bałtyk I offshore wind farm, which would allow the project to be built to its full capacity of 1,560MW. Bałtyk I is being jointly developed by Polenergia and Equinor, who acquired a 50% stake
The Nemo Link subsea interconnector between Belgium and Great Britain has become operational. The energy exchange started on Thursday, 31 January at midnight. An average of 773MW will be exchanged and a total amount of 18,559MWh will be transported for the whole day via the Nemo Link cable. The inte
Taiwan’s Ministry of Economic Affairs has set out the new feed-in-tariff (FiT) at TWD 5.5160/kWh (EUR 0.156731/kWh) for the 20-year offshore wind Power Purchase Agreements (PPAs) signed in 2019. The wind projects that sign their PPAs in 2019 will receive TWD 6.2795/kWh during the first ten years of
Rhenus Offshore Logistics has won the tender to provide the supply logistics for TenneT’s BorWin gamma HVDC platform in the German North Sea. Rhenus will be conducting the supply runs using the Eurus Express vessel from the offshore base in the Port of Emden until the end of the project. The company