TenneT and HSM Sign Borssele Beta Contract, Cut First Steel for Borssele Alpha
Dutch transmission system operator TenneT TSO B.V. and the Schiedam-based HSM Offshore have cut the first steel for the Borssele Alpha offshore transformer station and have signed a contract for the construction of the Borssele Beta platform.
Maersk Connector Loads First Nemo Link Cables
DeepOcean’s Maersk Connector has completed loading of the first phase on the Nemo Link cables in the port of Blyth.
JD-Contractor Nabs Nissum Bredning Cable Job
JD-Contractor, a danish subsea specialist, has won the contract for the cabling of the 28MW Nissum Bredning test and development wind farm off Denmark where Siemens Gamesa plans to utilise a range of new offshore wind solutions.
TenneT’s North Sea Wind Harvest Up by 50%
Transmission system operator TenneT transferred 7.77 terawatt hours (TWh) of energy from offshore wind farms in the North Sea to the mainland grid in the first half of 2017, a 50% jump compared to 5.18 TWh transferred from the North Sea in the first half of 2016.
Tideway and Turbine Transfers Prepping CTV Quartet for Merkur Offshore Wind Farm
Wales-based Turbine Transfers has won a contract to provide Tideway B.V., part of DEME Group, with four crew transfer vessels (CTVs) for the Merkur offshore wind farm project in the German North Sea.
MAATS Tech Delivers Cable Lay Equipment to NKT Victoria
UK engineers MAATS Tech delivered cable-laying equipment to NKT’s newbuild NKT Victoria prior to the vessel’s first project – the Caithness – Moray subsea link in Scotland.
JDR Completes Beatrice Inter-Array Cables
Hartlepool-based subsea cable specialist JDR has manufactured the inter-array cables for the 588MW Beatrice offshore wind farm, Beatrice Offshore Wind Farm Ltd (BOWL) said.
DEME Bags EUR 130 Million Deal for Belgian Modular Offshore Grid
Belgian transmission system operator Elia has awarded Dredging International, part of the DEME Group, with a contract for the subsea cable installation for the Modular Offshore Grid (MOG) in the Belgian part of the North Sea.
TenneT Kicks Off BorWin3 Subsea Cable Installation Works
Prysmian’s cable laying vessel Cable Enterprise is getting ready to install the next section of the 130-kilometre subsea cable link which will connect the 900Mw BorWin3 offshore station to the German grid.
Innogy Awards O&M Contract to EDS HV Management
Energy company innogy has awarded high voltage engineering specialist EDS HV Management a contract for operations and maintenance (O&M) management on the high voltage network at Rhyl Flats wind farm. The contract, running from 1 June, followed a competitive tendering process. It will see Rhyl Flats
STX France Gives Arkona Offshore Substation Construction Update
STX France AS has lowered the third and final block of the offshore substation topside, being constructed for the Arkona offshore wind farm, onto a transportation barge in the drydock of the company’s yard in St. Nazaire.
Ofgem Shortlists Galloper and Walney Extension OFTO Bidders
Ofgem has announced shortlists of bidders competing to own and operate transmission links to the Galloper and Walney Extension wind farms off the coasts of Cumbria and Suffolk.
Ofgem Shortlists Galloper and Walney Extension OFTO Bidders
Ofgem has announced shortlists of bidders competing to own and operate transmission links to the Galloper and Walney Extension wind farms off the coasts of Cumbria and Suffolk.
Triton Knoll Kicks Off Archaeological Campaign in Lincolnshire
Triton Knoll Offshore Wind Farm has begun an archaeological trial trenching campaign along the full route of the onshore export cable corridor in Lincolnshire.