A plan has been organized by State Oceanic Administration (SOA),China, Chinese Arctic and Antarctic Administration (CAA) and the Polar Research Institute of China (PRIC) to build an advanced new icebreaking research vessel to meet the increased need of polar scientific research. The new vessel will
IBERDROLA, through its UK subsidiary ScottishPower Renewables, has taken the first step towards construction of the Wikinger offshore wind farm in Germany, the largest project of its kind located at such depth (over 40 metres). It has awarded two contracts, worth €18 million, to British company Gard
China announces that its largest oceanographic research center in Qingdao is under construction. As China Daily reported, the Qingdao National Oceanographic Science and Technology Laboratory is expected to grow into a leading oceanographic research institution within 10 years. The center is a joint
The European Marine Energy Centre today (Tuesday, July 31) welcomed the UK’s Energy and Climate Change Minister Greg Barker to its world-leading facilities in Orkney as part of a governmental visit to the region. EMEC – the only accredited wave and tidal test centre for marine renewable energy in th
DHI Group’s research into long-term scour predictions has borne fruit in the form of a specialty tool – WiTuS. With WiTuS, it is now possible to model long-term predictions on scouring around monopile type foundations – structures which form the bases of majority of the current and planned offshore
Cal Dive International, Inc. announced today that it has entered into a 50/50 strategic partnership with Fugro for the long-term charter of the DP2 Toisa Paladin, a 2007 purpose built, DNV classed, diving support vessel. The charter party agreement with Toisa Pte Ltd will be shared equally between C
Karoon Gas Australia Ltd advises that at 06:00 hours (WST) today, troubleshooting of the BOP was being conducted on the sea floor. Since the last report, the BOP and marine riser were pulled from the hole for further testing and repairs on the deck of the rig. Following these repairs the BOP and mar
Based in two North East England locations, an area known for its deep industrial heritage, A&P North East is a company with ship repair and conversion yards on the rivers Tyne and Tees. Part of the A&P Group which also includes A&P Falmouth where ship repair and conversion services have been taking
The kick off meeting of the Joint Industry Project (JIP) Wind Jack was held on 19 July. Deltares will carry out this project together with MARIN and with engineering offices, ship builders, ship owners and contractors from The Netherlands, Belgium, Germany and Singapore. Within the Wind Jack Joint I
Greenpeace researchers have discovered abundant corals where Shell hopes to begin Arctic offshore drilling this summer. The discovery raises questions why the Arctic corals are not adequately addressed in the environmental impact statement for Shell’s drilling program. Greenpeace submarine research
Polarcus Limited announces the release of its second quarter 2012 financial statements. The second quarter 2012 was characterized by improved market conditions. This was reflected in the high utilization of 89% in the quarter. Revenues increased largely due to having two more vessels in operation an
FAR Limited (FAR), an independent Australian Securities Exchange listed oil and gas explorer with high impact assets in West and East Africa has announced quarterly report for the period from 1 April 2012 to 30 June 2012 with the cash balance of $33.7M. FAR also announced the completion of 3D seismi
In most coastal and estuarine settings the seabed elevation (water depth/bathymetry) changes due to the processes of sediment and sediment deposition on a daily basis. More pronounced changes occur when wave energy can penetrate to the seabed during winter storms. Changes in seabed level greater tha
The Crown Estate has issued a study highlighting the opportunities that exist for suppliers to address the current gap between anticipated demand and currently available supply of export power cables for offshore wind farms. The study identified that current manufacturing capacity does not meet the