Technology
India: BEML Ltd in Growth Mode
BEML Ltd will sign an agreement with a European firm to foray into dredging equipment manufacture. According to chairman and managing … (constructionupdate) [mappress] Source: constructionupdate, February 11, 2011;
Alstom and LM Wind Power Join Together to Develop Offshore Wind Turbines (Denmark)
Alstom and LM Wind Power this week announced plans to jointly develop the world’s longest wind turbine blades for offshore wind turbines. (energyonline) [mappress] Source: energyonline, February 11, 2011
Atlantis Tidal Turbine to be Built in Province (USA)
Nova Scotia’s bid to become a North American leader in the development, supply and support of tidal energy projects took another step forward today with the announcement that an international consortium will test one of the world’s largest tidal turbines in the Bay of Fundy’s aggressive marine envir
Atlantis Tidal Turbine to be Built in Province (USA)
Nova Scotia’s bid to become a North American leader in the development, supply and support of tidal energy projects took another step forward today with the announcement that an international consortium will test one of the world’s largest tidal turbines in the Bay of Fundy’s aggressive marine envir
US Fish & Wildlife Service Orders MERLIN Avian Radar Systems
DeTect, Inc. has announced that it has received an order from the U.S Fish and Wildlife Service (USFWS) for two MERLIN Avian Radar Systems. The bird radar systems will be delivered to the USFWS Great Lakes – Big Rivers Region 3 in March 2011 and will be primarily used by the service to assess and [&
Ashtead Technology Ltd Appointed as Exclusive Global Rental Representative for Vortex International Ltd
Ashtead Technology has been appointed as exclusive Global Rental Representative, within the Oil and Gas sector, for Vortex International Ltd for the rental of the Vortex Dredge Unit. The most powerful 4 inch ROV and diver dredge unit in the world (40 to 50 ton/hr), the Vortex, has removal rate perfo
LM Wind Power to Develop the World’s Longest Wind Turbine Blades for Offshore Wind Turbines (Denmark)
Record blade pushes the limits to bring down the Cost of Energy of offshore wind. LM Wind Power and Alstom have entered a strategic partnership to develop the longest wind turbine blade ever produced, designed to fit Alstom’s new 6 MW wind turbine for the growing European offshore wind market. This
Gaoh Offshore Announces Signing of Letter of Intent With STX Offshore & Shipbuilding Covering Wind Turbine Installation Vessel Development (UK)
UK Wind Energy Services company, Gaoh Offshore announced the signing of a Letter of Intent covering the design development and construction… (tos) [mappress] Source: tos, February 08, 2011
Lloyd Werft Close to Sealing Cable-Laying Vessel Order From Bremen’s Beluga Shipping (Germany)
IHS Fairplay reports that Lloyd Werft is reportedly close to sealing an order for a cable-laying vessel from Bremen’s Beluga Shipping. The vessel, with a length of 110m and breadth of 28m, is to be delivered in mid-2012 for deployment on a North Sea offshore windfarm, the German daily newspaper NWZ
China: GN Brand Presents Dredging Slurry Separation System
The GN 300 GPM dredging slurry separation system has been designed specifically to accept feed directly from the dreding at a maximum rate 300M3 per hour, GN dredging slurry Separation system equipments: 1. GNZS83-3 Linear motion slurry separation shale shaker. 2 sets 2. GNZJ83-3 slurry separation d
Seajacks Zaratan Construction Summary (UK)
In February 2010 Seajacks entered into a contract with GustoMSC to provide the Basic Design Package for two purpose built wind farm installation vessels. In June 2010 Seajacks entered into a contract with Lamprell shipyard to build these new vessels and Seajacks will take delivery of the first new-b
Second New Building of Type 183 Near Completion (Germany)
In March 2011, SAL will take into service its second Type 183 heavy lift vessel. The vessel is under construction at the Sietas shipyard in Hamburg. The innovative ship will be the second heavy lift vessel with 2 x 1,000 tonne SWL cranes. It is also capable of maintaining a speed of 20 knots. [&hell
CSIRO Coastal Glider to Investigate Flood Impact on Moreton Bay’s Ecosystems (Australia)
An AUD200,000 CSIRO coastal glider is bound for Queensland, Australia, to be deployed in Moreton Bay to investigate the impact of the … (hydro-international) [mappress] Source: hydro-international, February 4, 2011;
APM Terminals Liberia Goes Live
APM Terminals Liberia has officially started operations on schedule with the first port call of the CHARLOTTA. APM Terminals has taken over the 25-year concession agreement to operate the Port of Monrovia in Liberia, based on the government ratification in October 2010. The concession agreement also