Hull could become a hub for offshore wind manufacturing facilities, judging on the claims that the newly formed company between Mitsubishi Heavy Industries (MHI) and Vestas could build its wind turbine factory in the city. It has been just a little over a month since Siemens decided to invest a larg
Bayards Aluminium Constructies, a specialist in light weight and maintenance free structures for the offshore industry, has paired up with Barge Master, a pioneer in motion compensated equipment for the offshore industry, to design the first aluminium Motion Compensated Helideck. The new Motion Comp
Initiated by the CEDA Environment Commission (CEC), a working group was formed in October 2013 to provide an overview on how adaptive management principles could contribute to the environmentally sound execution of dredging projects. The following CEDA/WEDA members volunteered to share their experti
NMDC Bags Important Contract in Bahrain National Marine Dredging Company (NMDC), the UAE-based firm, has won a multi-million reclamation contract as part of the projected East Sitra Town scheme. The Bahamas: Dredger “Niccolo Machiavelli” Arrives in Bimini A mammoth seafloor dredger, dubbed ‘The Re
The Port of Cork Company has lodged a planning application with An Bord Pleanála for the Ringaskiddy Port Redevelopment project in the lower harbour. The application is being made under the Planning and Development (Strategic Infrastructure) Act. The planning application to An Bord Pleanála includes
Offshore WIND’s photo of the day: The JB 117 self-elevating platform, owned by Jack-Up Barge B.V., doing its job on the BorWin beta platform. The BorWin beta platform will transform the alternating current (AC) supplied by wind turbines from two offshore wind farms, Veja Mate and Global Tech 1, befo
The European Commission is helping to take seabed mining to the next level by funding a four-year project entitled: “Breakthrough Solutions for Mineral Extraction and Processing in Extreme Environments – Blue Mining”. The overall aims of this project are to develop new cost-effective solutions for e
VIDEO: Alstom’s 6MW Turbine Spinning at Belwind Site Last year in November, Alsom installed 6-MW Haliade™ 150, off Ostend harbour at the Belwind site in Belgium. 40th AREVA Wind Turbine Installed at Global Tech I The construction of towers and nacelles in the North Sea wind farm Global Tech I is run
The Minister for Agriculture, Food and the Marine, Simon Coveney TD, yesterday announced details of a €4m dredging project at Dunmore East Fishery Harbour Centre on the occasion of the official opening of a €450,000 renovation of the Marine Leisure Area at the western end of the harbour. The €450,00
E.ON’s construction of Amrumbank West wind farm in the North Sea reached an important milestone. The offshore transformer station is now in place. The largest single technical component of the billion-euro project weighs approximately 3,000 metric tons. It consists of a foundation anchored to the se
Less than six months after Dong Energy ordered a second FLiDAR wind measuring device, the buoy has been installed on site and is fully operational. Dong Energy also signed a long term operation and maintenance agreement. The deployment, which involved specialized FLiDAR personnel took just 1 day to
L&M Keating Ltd, has recently won the Arklow Harbour dredging contract. During this EUR 2,2 mln cleanup scheme, about 60,000 tonnes of material will be removed from the turning basin, dock and river channel in Arklow Harbour. The dredged material will be dumped out at sea. The project will commence
Conseil Régional de la Réunion has announced a tender for a dike construction project in the Saint-Denis area. This contract will involve construction of approximately 2,700m section of dike, located offshore, and hydraulic structures built as part of the new coastal route project between the Grande
The Port of Wells dredging program is scheduled to commence next week. The port’s dredger “Kari Hege” will be engaged in dredging operations in the main channel north of number 4 buoy, between buoys 2 and 4. All material dredged from these areas will be placed on the berm which is marked by the port