During the Oceanology International 2014 exhibition, Stema-Systems will introduce the new DensiTune Portable system for rapid fluid mud assessment. This DensiTune P system weighs in total 15 kg and is suited for hand carried transport. This piece of equipment can be deployed on any vessel for sedime
Frazer-Nash is working with Marine Current Turbines to provide engineering and related technical services to help minimise fatigue loads on its next generation SeaGen tidal turbine, and reduce the costs and risks associated with this renewable technology. Marine Current Turbines appointed Frazer-Nas
Tidal energy developer, Oceanflow Energy Limited, has attracted a £300,000 package of support to further develop and commercialise its second generation tidal energy device, Evopod. The company, which has been supported by Scottish Enterprise through its WATERS scheme, has developed and patented a t
Tidal energy developer, Oceanflow Energy Limited, has attracted a £300,000 package of support to further develop and commercialise its second generation tidal energy device, Evopod. The company, which has been supported by Scottish Enterprise through its WATERS scheme, has developed and patented a t
A comparative patent analysis between the leading offshore wind nations: Denmark, England and Germany, has set the German offshore wind industry as a clear frontrunner in the field of innovation. The subsidiary of Wind Energy Agency WAB e.V., germanwind GmbH, came to this conclusion after examining
A Sealite Nautilus ocean buoy with 3-5NM+ marine lantern was recently installed at the Scroby Sands Wind Farm, 2.5km off the coast of Great Yarmouth in eastern England. The North Sea has some of the busiest shipping lanes in the world, and with on-going development of energy resources in the area,
GE Power Conversion has announced the successful trials of PassiveBoost™, the technology which will allow remote power networks to go DC. This is an important step in lowering the cost of power delivered from offshore installations and increasing the electrical output delivered from renewable energy
European countries need to join forces to manage flood risks in the future. By 2050, the financial losses caused by floods may exceed current levels five times over. That is the conclusion of a study from the VU University in Amsterdam involving Deltares. This European research project linked four t
Experts from Bachmann electronic GmbH and Bachmann Monitoring GmbH will be presenting innovative hardware and software solutions for the international wind energy industry at this year’s annual conference of the European Wind Energy Association (EWEA) from 10 to 13 March 2014. At Bachmann electronic
The MacArtney Group will showcase a number of new underwater technology products and solutions for the ocean science, oil and gas, dredging and diving industries at the 2014 edition of the Oceanology International exhibition (11-13 March, ExCeL Exhibition and Convention Centre, London). These additi
On February 28, 2014, IHC Global Production B.V, part of IHC Merwede, and Uljanik d.d. signed the contract for the construction of one self-propelled cutter suction dredger. The installed power of the vessel will correspond to 23,684 kW, the length of the vessel will be 152 m and the width 28 m. The
Caterpillar has introduced its new Cat® 336F excavator, built to meet U.S. EPA Tier 4 Final emissions standards. This piece of equipment comes equipped with several features to enhance fuel efficiency. Electric boom and stick regeneration valves capture and recycle energy, and an engine idle shutdow
Maritiem Cluster Friesland delivered another DP1 Multi Purpose Support vessel 3512 to Acta Marine. Lady sponsor Mrs. E. (Litsa) Kwantes, named the ‘’Coastal Chariot’’ of Acta Marine on 20th February in Rotterdam. The multi-purpose vessel has been custom-built and constructed within only 12months. Th
Cowes Harbour Commission (CHC) appointed Boskalis Westminster to undertake construction of the new £7 million detached breakwater for Cowes on the Isle of Wight. The construction of the new breakwater will be carried out in two phases, with the first phase, creating the core structure of the breakwa