Development agency Highlands and Islands Enterprise (HIE) has reached an agreement with administrators KPMG to acquire intellectual property and a range of physical assets previously owned by Pelamis, which went into administration in November 2014. HIE has obtained the assets on behalf of Wave Ener
Carried to its final destination on self-propelled motorized wheel transporters (SPMTs) with more than 400 wheels each, the first gate for the new locks in the Pacific side was installed earlier today, marking another important milestone for the Panama Canal Expansion Program. Overall, the Canal exp
HIE has obtained Pelamis’ assets on behalf of Wave Energy Scotland (WES), a new body established to support Scotland’s wave energy sector, it is stated in the HIE’s press release. Aside from a range of physical assets previously owned by Pelamis, Highlands and Islands Enterprise (HIE) has agreed wit
ORPC power systems are designed around their proprietary Turbine Generator Unit, or TGU. TGU works on the same principle as a wind turbine, with rotating foils that power a central permanent magnet generator. There are three different ORPC’s TGU power systems: RivGen®, TidGen® and OCGen® – each desi
The SCORE (Supply Chain Innovation for Offshore Renewable Energy) programme continues to provide grant funding to innovative ideas coming out of the East of England to benefit the offshore renewable energy sector. The latest grant recipients have been announced as offshore and vessel support special
International Renewable Energy Agency (IRENA) has launched REsource, a freely accessible online knowledge platform containing data and information on renewable energy, which enables users to easily find country-specific data, create customized charts and graphs, and compare countries on metrics like
Waterking, one of the market leaders in Western Europe in the production of amphibious excavators and accessories, has developed a new amphibious machine, the Transporter. The Transporter is designed for transporting people and equipment through wetlands, deltas and poor load-bearing terrains. The u
Aberdeen based Hydro Group Plc, a designer and manufacturer of underwater cables and connectors for subsea, underwater, topside and onshore applications for the Oil & Gas, Renewable Energy, Defence and Aerospace Industry, has boosted its portfolio with state-of-the-art machinery, following a £300,00
Aberdeen based Hydro Group Plc, a designer and manufacturer of underwater cables and connectors for subsea, underwater, topside and onshore applications for the Oil & Gas, Renewable Energy, Defence and Aerospace Industry, has boosted its portfolio with state-of-the-art machinery, following a £300,00
Alstom is back at the World Future Energy Summit (WFES), from the 19th to the 22nd of January, to present its latest technologies and long-lasting expertise in renewable energy and electricity transmission. This gathering on the future of energy aiming at addressing the world’s energy challenges is
The cost of generating power from renewable energy sources has reached parity or dropped below the cost of fossil fuels for many technologies in many parts of the world, the International Renewable Energy Agency (IRENA) revealed in a new report. The landmark report, Renewable Power Generation Costs
A group of maritime engineering students share a futuristic vision to send robots into outer space to explore planetary lakes. The potential uses for these robots on Earth is also limitless, including sending fleets of drones to provide quick and safe response to natural disasters and creating a “wi
A group of maritime engineering students share a futuristic vision to send robots into outer space to explore planetary lakes. The potential uses for these robots on Earth is also limitless, including sending fleets of drones to provide quick and safe response to natural disasters and creating a “wi
The U.S. Army Corps of Engineers wrapped up federal navigation channel dredging at Ice Harbor Lock and Dam on January 14. Ice Harbor lock operations have returned to normal and dredging equipment has been removed, including water quality monitoring buoys, and relocated upstream to work areas in the