Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Turbines

Loading filters...
Offshore WindVesselsWind FarmsInfrastructureProject & TendersBusiness Developments & ProjectsTechnologyBusiness & FinanceResearch & DevelopmentClean FuelHydrogenOutlook & StrategyTransitionFoundationsInnovationPorts & LogisticsCertification & Classification
BoldWind loading nacelles for Triton Knoll at LINDØ port of ODENSE
Turbines

BoldWind picks up Triton Knoll nacelles in Odense

The MV BoldWind heavy load deck carrier has picked up the wind turbine nacelles for the Triton Knoll offshore wind farm at the LINDØ site in the Danish port of Odense. The vessel arrived there last week, according to LINDØ, which added that this was the first port call there for MV BoldWind. After l

about 5 years ago
An image showing an SOV vessel at an MHI Vestas wind turbine
Turbines

MHI Vestas’ Seagreen turbines to feature Siemens Energy gear

MHI Vestas has chosen Siemens Energy’s low-loss 66 kV distribution transformers for the 114 wind turbines that will make up the Seagreen offshore wind farm in Scotland. The fluid immersed distribution transformers, for which Siemens Energy said were designed to meet high efficiency requirements, wil

about 5 years ago
A blade being installed at a SeaMade wind turbine
Turbines

SeaMade offshore wind farm begins countdown to completion

The SeaMade offshore wind farm is nearing completion with only three wind turbines left to be installed. Located 50 kilometres off the Belgian coast in the North Sea, the offshore wind farm will comprise 58 Siemens Gamesa 8.4 MW turbines, 55 of which are now in place. This is according to social med

about 5 years ago
ORE-Catapult-Invests-in-Blade-Manufacturing-Facility
Turbines

ORE Catapult invests in blade manufacturing facility

Offshore Renewable Energy (ORE) Catapult is investing in a prototype blade manufacturing facility at its National Renewable Energy Centre in Blyth. The Additive Manufacturing for Wind Blades project will install an advanced manufacturing cell that aims to prove technologies that can reduce blade pro

about 6 years ago
New-UK-Project-Targets-Offshore-Wind-Energy-Loss-Reduction
Turbines

New UK collaboration targets offshore wind energy loss reduction

The University of Southampton and Flightform Insights have teamed up to develop a novel wake and wind generation model to minimize energy losses from offshore wind farms. The aim is to help offshore wind developers optimize the turbine layout of their wind farms by minimizing the losses caused by th

about 6 years ago
Wind turbines at sea with a wake visible behind each
Turbines

Siemens Gamesa’s FY2020 revenues drop, but offshore wind order intake doubles

The fiscal year 2020 has ended at Siemens Gamesa Renewable Energy (SGRE), which reported a decline in revenues, but also a record order intake. In its outlook, the wind turbine supplier sees boosts in several markets, such as the green hydrogen plans in the EU, Democrats’ push for net-zero 2050 in t

about 6 years ago
Inspect-and-Repair-Robot-Performs-First-Ever-Blade-Walk
Turbines

Inspect-and-repair robot performs first-ever blade walk

The BladeBUG inspect-and-repair robot for offshore wind turbine blades has carried out its first open door walk on an operating turbine. Over two days in mid-October, the six-legged robot repeatedly scaled blades on ORE Catapult’s 7 MW Levenmouth Demonstration turbine located off the coast of Fife.

about 6 years ago
A wind turbine nacelle at Siemens Gamesa's Cuxhaven nacelle factory
Turbines

Siemens Gamesa produces 500th offshore wind turbine nacelle in Cuxhaven

Siemens Gamesa has produced the 500th nacelle for an offshore wind turbine at its manufacturing plant in Cuxhaven, Germany. The milestone was reached with a nacelle for the Hornsea Two offshore wind farm in the UK. The offshore nacelle manufacturing plant in Cuxhaven was opened in 2017 and regular o

about 6 years ago
BlueSATH floating wind prototype capsizes during Hurricane Epsilon
Turbines

BlueSATH floating wind prototype capsizes during Hurricane Epsilon

The scaled-down BlueSATH floating wind turbine prototype has capsized offshore Santander, Spain, during what is described as a ”historic swell generated by Hurricane Epsilon”. The 1:6 BlueSATH prototype, installed in El Abra del Sardinero back in August, had already completed its testing campaign in

about 6 years ago
First Triton Knoll turbine parts arrive at Able Seaton Port
Turbines

First Triton Knoll turbine parts arrive at Able Seaton Port

The first turbine blades to be installed on the Triton Knoll offshore wind farm have arrived at Able Seaton Port, the project’s construction port in Teesside. This marks the first time that Able Seaton Port is receiving offshore wind turbine components in its history, after a combined multi-million

about 6 years ago
Nezzy² two-turbine platform stable in the water during storm “Gisela”
Turbines

Two-turbine floater prototype breezes through tests in Baltic Sea

The scaled-down version of the Nezzy² floating wind turbine, a two-turbine floating wind platform, completed its two-month tests in the Bay of Greifswald in the Baltic Sea and has now been dismantled. Over the coming weeks, the recorded data from the tests will be evaluated, with the findings to be

about 6 years ago
Two-Turbine-Floater-Secures-DNV-GL-Feasibility-Statement
Turbines

Two-turbine floater secures DNV GL feasibility statement

DNV GL has awarded aerodyn engineering with a statement of feasibility for its nezzy² double rotor floating wind turbine concept. According to DNV GL, this statement confirms that the floater is designed to state-of-the-art safety, quality and performance standards. It is said to allow aerodyn to se

about 6 years ago
MHI Vestas gets new CEO, executive management
Turbines

MHI Vestas gets new CEO, executive management

Mitsubishi Heavy Industries (MHI) and Vestas Wind Systems have appointed Johnny Thomsen as the new CEO of MHI Vestas Offshore Wind. Thomsen is taking over from Philippe Kavafyan who has left the company after holding the CEO position for two and a half years. As of Thursday, 29 October, the executiv

about 6 years ago
Vestas to take full ownership of MHI Vestas
Turbines

Vestas to take full ownership of MHI Vestas

Vestas Wind Systems and Mitsubishi Heavy Industries have signed an agreement through which Vestas will acquire MHI’s shares in the MHI Vestas Offshore Wind joint venture. Vestas is to acquire MHI’s 50 per cent share of the MHI Vestas joint venture against 5,049,337 shares in Vestas that will be issu

about 6 years ago
  • 1
  • …
  • 8
  • 9
  • 10
  • …
  • 17