RasGas’ long-term chartered Q-Flex vessel Al Sahla docked at the Dutch Gate LNG terminal in the Port of Rotterdam on Monday, April 27. The 216.200 cbm vessel is currently unloading a cargo of the chilled gas, which it brought from the world’s largest LNG complex located in Port of Ras Laffan, Qatar.
RasGas’ long-term chartered Q-Flex vessel Al Sahla docked at the Dutch Gate LNG terminal in the Port of Rotterdam on Monday, April 27. The 216.200 cbm vessel is currently unloading a cargo of the chilled gas, which it brought from the world’s largest LNG complex located in Port of Ras Laffan, Qatar.
The keel laying event for the 1,840 m3 trailing suction hopper dredger took place at MTG Dolphin Shipyard in Varna, Bulgaria, on 22nd of April, 2015. The vessel, being built under yard number BN802 by order of Royal IHC for Dutch Dredging, will be delivered in late autumn of 2015. She is a standardi
Van Oord, a Dutch contracting company that specializes in dredging and land reclamation, has just published its annual report 2014. The annual report 2014 looks back on an exceptional year, according to CEO Pieter Van Oord: “The year was special because for the first time in our history, our turnove
FKAB Marin Design, Sweden, has just released a video about one of their latest designs, the Dredger NOSPER – No Split Engine Room. After several years of designing for the dredging industry, where they have created both pure split hopper barges, trailer suction dredgers with bottom doors as well as
The UK’s South Hook LNG terminal is scheduled to receive the sixth cargo of LNG from Qatar in April.
The UK’s South Hook LNG terminal is scheduled to receive the sixth cargo of LNG from Qatar in April.
Construction works on the second phase of a major £36 million coast protection scheme in Tendring are now in full swing with trailing suction hopper dredger Sospan Dau blowing sand across the location. Phase one of the project between Holland Haven to Fernwood Avenue was recently completed, with the
GasLog and GasLog Partners said that GasLog has agreed to charter to Methane Services, a BG Group unit, three of GasLog’s uncontracted newbuilds that are currently under construction.
GasLog and GasLog Partners said that GasLog has agreed to charter to Methane Services, a BG Group unit, three of GasLog’s uncontracted newbuilds that are currently under construction.
Zeebrugge LNG terminal in Belgium is scheduled to receive a new delivery of Qatari liquefied natural gas.
Zeebrugge LNG terminal in Belgium is scheduled to receive a new delivery of Qatari liquefied natural gas.
Jan De Nul Group has secured two contracts with Dong Energy to execute cable installation works for the Burbo Bank Extension Offshore Wind Farm in Liverpool Bay. A first one for the installation of the export cables, and a second one for the installation of the infield cables. Jan De Nul Group will
The UK’s South Hook LNG terminal is scheduled to receive another shipment of Qatari liquefied natural gas.