Dragon LNG terminal is scheduled to receive a cargo from Qatar, according to the Milford Haven Port Authority website.
Dragon LNG terminal is scheduled to receive a cargo from Qatar, according to the Milford Haven Port Authority website.
Wärtsilä said it has signed a 5-year Technical Management Agreement with Golar Management Oslo for delivery of services to Golar LNG.
Wärtsilä said it has signed a 5-year Technical Management Agreement with Golar Management Oslo for delivery of services to Golar LNG.
REN’s Sines LNG terminal in Portugal is expected to receive a cargo of the chilled gas on April 8. The 160,000 cbm Golar Crystal is carrying the cargo from Nigeria’s 22 Mtpa Bonny LNG plant, port data reveals. Golar has in January this year chartered Golar Crystal to Nigeria LNG, the operator of the
REN’s Sines LNG terminal in Portugal is expected to receive a cargo of the chilled gas on April 8. The 160,000 cbm Golar Crystal is carrying the cargo from Nigeria’s 22 Mtpa Bonny LNG plant, port data reveals. Golar has in January this year chartered Golar Crystal to Nigeria LNG, the operator of the
Peru’s only LNG export terminal dispatched two cargoes on its way to Mexico and Spain according to Perupetro.
Peru’s only LNG export terminal dispatched two cargoes on its way to Mexico and Spain according to Perupetro.
Scheepswerf Gebr. Kooiman BV, a subsidiary of The Kooiman Group, has inked a contract to complete a conversion project for the trailing suction hopper dredger Ostsee. The conversion involves the replacement of dredging installation’s electrical drives with the direct diesel drives. Two jet water pum
SC Klaipedos Nafta said that during March 2015, the company received one cargo at the LNG terminal totaling 65.95 thousand tons of LNG.
SC Klaipedos Nafta said that during March 2015, the company received one cargo at the LNG terminal totaling 65.95 thousand tons of LNG.
For the first time, Van Oord named a vessel at its Rotterdam head office jetty. The vessel is a water injection dredging vessel that is almost 19 m long and more than 5 m wide. Van Oord employee Ms Jacqueline Determann named the vessel Borr. Water injection dredging is a proven technique for small-s
After having completed the Liquified natural gas sea trials, the F.-A.-Gauthier ferry built by Fincantieri in its shipyard in Castellammare di Stabia, left the yard today sailing to Matane, in Québec, Canada.
After having completed the Liquified natural gas sea trials, the F.-A.-Gauthier ferry built by Fincantieri in its shipyard in Castellammare di Stabia, left the yard today sailing to Matane, in Québec, Canada.