Last week Idreco delivered the first dredger for the company Wolfgang Rohr GmbH & Co. KG. This ISD 300 has an undewater pump and engine with a suction depth of 32 meters. The dredger is equipped with the PK 300 pump driven by the electric direct drive system with a 315KW motor. Production capacity u
On 22 May LNG tanker Grand Aniva replenished fuel supplies in the Russian port of Nakhodka and became the first gas carrier to perform bunkering operation in Russia. Previously only oil tankers of Sovcomflot entered this port. Gas tankers working for the Sakhalin-2 project usually took the bunker in
The Coopération technique Belge has invited bidders for the repair and maintenance work to the dredger “Kasai”. This dredging vessel is currently based in the RD Congo. Works will include all mechanical, electrical and structural improvements and replacement of parts where necessary. Divided into lo
Höegh LNG has through its 50/50 joint venture company Methane Carriers Ltd. signed an agreement with Gas Natural Aprovisionamientos SDG (Gas Natural) for an extension of the time charter for the 87,000 m(3) LNG carrier Norman Lady at improved commercial terms. The agreement is for further trading fo
The Bu Samra LNG carrier, with a capacity of 266,000 cubic metres, is due to arrive in the UK’s South Hook terminal on June 1, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic me
Spain’s Bilbao import terminal is scheduled to receive a shipment of LNG from Trinidad next week, according to port data. The cargo is being hauled by the Iberica Knutsen carrier, with a capacity of 130,000 cubic metres, and it is due to arrive at the Bilbao terminal on June 2. Bilbao terminal facil
UK’s Dragon LNG terminal received a cargo from Nigeria today onbaord the 145,613 cbm Methane Heather Sally, according to shipping data. BG and Petronas between them have contracted for the full capacity at Dragon LNG’s Milford Haven site over the next 20 years. BG owns 50 per cent of Dragon LNG Term
Peru LNG shipped a liquefied natural gas cargo to Spain on May 20, according to PeruPetro S.A. The cargo is being hauled by the Ribera del Duero Knutsen, a 173,000 cubic-meter tanker owned by Knutsen OAS Shipping. The Peru LNG project includes two parts: an LNG plant with a marine terminal from whic
The Methania liquefied natural gas carrier, with a capacity of 145,702 cubic metres, is due to arrive in the Zeebrugge LNG terminal on May 27, according to shipping data. The liquefied natural gas carrier will probably load in a re-export cargo and depart from the Zeebrugge terminal next day. The Ze
HR Wallingford has developed a remote controlled boat that can be used to accurately measure river and estuarine data including flow, depth and suspended sediment concentrations. It uses a technology called Acoustic Doppler Current Profiling which sends acoustic pulses in to the water to generate da
The Al Kharaitiyat LNG carrier, with a capacity of 216,000 cubic metres, is due to arrive in the UK’s South Hook terminal from Qatar on May 28, according to port data The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 billion cubic metres of gas [&h
UK’s South Hook LNG terminal will receive another cargo of LNG next week, according to the Milford Haven Port Authority website. The Al Sheehaniya LNG tanker, with a capacity of 210,oo0 cbm, is sailing from Ras Laffan, Qatar. The South Hook LNG terminal, a part of the Qatargas 2 integrated value cha
A new, larger and more powerful CSD650 joins the Damen Standard series of Cutter Suction Dredgers. The addition to the range results from a buoyant demand in the market and the continuous innovation of Damen Dredging Equipment, based on years of experience. The CSD650 is past its drawing table stage
The Lijmiliya LNG carrier, with a capacity of 263,000 cubic metres, is due to arrive in the UK’s South Hook terminal from Qatar on May 25, according to the Milford Haven Port Authority website. The South Hook terminal can process 15.6 million tonnes of LNG a year and is capable of delivering 21 bill