Wind Farms

Icebreaker deal-breaker is no more
The Ohio Power Siting Board has removed a requirement for the Icebreaker Wind project in Lake Erie to shut down its wind turbines during nighttime hours from March through November. Back in May, the Board approved the construction of the Icebreaker Wind project with 33 conditions, one of which was t

First Kincardine floating foundation en route to Rotterdam
Boskalis’ semi-submersible heavy transport vessel Fjord has set sail from Spain to the Netherlands carrying the first floating foundation for the Kincardine offshore wind project in Scotland. Fjord began its journey from Navantia’s yard in Fene on 7 October towards Rotterdam, where the turbine will

First foundation in place at Hornsea Two offshore wind farm
The first out of the total of 165 monopile foundations has been installed at the Hornsea Two offshore wind farm site in the UK, according to social media updates from Ørsted. The milestone comes around a week after the jacket foundation for the wind farm’s offshore substation was installed. DEME’s j

Siemens Gamesa, Vinci VR developing virtual reality training for US offshore wind
Siemens Gamesa and Boston-based startup Vinci VR have secured funding from the Massachusetts Clean Energy Center to develop Virtual Reality (VR) training simulations for the offshore wind sector in Massachusetts and the U.S. East Coast. The USD 124,670 grant will be used to create the first Global W

2050 starts in 2020, and it starts with offshore wind and green hydrogen
Humankind achieved its first interstellar flight in 2063 with a spacecraft powered by a warp drive, based on a matter-antimatter system fuelled by deuterium, a hydrogen isotope, and its antimatter equivalent. This is according to Star Trek, a series famous for featuring several things we might take

Seaway 7 adds Correll Services to Yunlin cables team
Correll Services (CS) has won a contract to provide the termination and testing of the individual submarine composite cables at the Yunlin wind farm offshore Taiwan. CS was selected for the work by Seaway 7, the renewables business unit of Subsea 7. Seaway 7 is in charge of the supply and installati

Polish join Hollandse Kust Noord OSS work
Ultra NDT S.C. and Jaworski Energy Services have signed a contract with the ENGIE Solutions Belgium and Iemants joint venture for work on the Hollandse Kust Noord substation topside. Ultra NDT S.C. has been selected as the third-party responsible for non-destructive testing, with Jaworski Energy Ser

Ørsted holding Ocean Wind online meets
Ørsted is hosting three virtual open houses to update interested parties on the progress of its Ocean Wind offshore wind project in New Jersey. Attendees will listen to subject matter experts discuss specific aspects of the company’s plans to build the 1,100 MW offshore wind farm. The open houses wi

Global Tech I looking for heli services
Global Tech I Offshore Wind GmbH has issued a tender seeking helicopter services for the 400 MW offshore wind farm in the German North Sea. The tender seeks a service provider to carry out helicopter flights for the regular transport of people and freight, including dangerous goods, from Emden to th

Total adds another floating wind project to its portfolio
Total has bought a 20 per cent stake in the EolMed floating wind pilot project in France, located in the Mediterranean Sea, off the coast of Gruissan and near Port-La-Nouvelle. The 30 MW EolMed will feature three MHI Vestas 10 MW turbines installed on Ideol’s Damping Pool floating foundation and is

Chinese monopiles begin journey to Vietnam’s offshore wind project
China’s TSP Blue Island has sent off the first batch of monopile foundations for the 310 MW Binh Dai offshore wind project in Vietnam. At the end of September, 31 monopiles began their journey from Nantong, Jiangsu Province, to the Vietnamese province Binh Tre. Binh Dai will comprise a total of 74 t

UK Prime Minister: Offshore wind to power every home by 2030
UK Prime Minister Boris Johnson has set out commitments to ensure that offshore wind will produce more than enough electricity to power every home in the country by 2030, based on current electricity usage, boosting the government’s previous 30 GW target to 40 GW. The commitments, part of the Build

WSP to re-design Vineyard Wind wind turbine foundations
WSP USA will carry out a re-design of the wind turbine foundations for the Vineyard Wind offshore wind farm in Massachusetts. Following recent permitting changes, Vineyard Wind modified the turbine layout and the U.S.-based engineering consultancy will now work on the re-design, after having provide

Triton Knoll moving into turbine installation phase
The first turbine components for the Triton Knoll wind farm are expected to arrive at MHI Vestas’ logistics and pre-assembly hub in the Able Seaton Port in Hartlepool next month. MHI Vestas has now moved in to Able Seaton Port in preparation to start installing 90 of its V164-9.5 MW turbines at the