
Italy-headquartered Prysmian has completed the installation of the export cable for the 30 MW Gruissan/EolMed floating offshore wind project in France. In 2021, Prysmian signed a contract with the French transmission system operator (TSO) Réseau de Transport d’Électricité (RTE) for the engineering,

The repairs on the cable linking the 309 MW Rentel offshore wind farm to mainland Belgium have been completed about four months after it failed. The fault was located just below the Rentel transformer platform, said the Belgian transmission system operator (TSO) Elia. A new section of the cable, app