Advertisement

Wind Farms

CGN’s 300MW Pingtan OWF Greenlighted
Wind Farms

CGN’s 300MW Pingtan OWF Greenlighted

The Fujian Province Development and Reform Commission has approved a 300MW offshore wind farm developed by China General Nuclear Power Corporation (CGN) north-east of Pingtan Island in the Fujian Province. In December 2014, the project was listed in the National Offshore Wind Power Project Developme

about 10 years ago
Bladt Displays Arkona Transition Piece
Wind Farms

Bladt Displays Arkona Transition Piece

Bladt Industries has published a photo of one of the 60 transition pieces that the company will manufacture for the Arkona offshore wind farm. EEW SPC and Bladt are in charge of supplying the foundations for the project, with EEW delivering 60 monopiles and Bladt providing the transition pieces. Bot

about 10 years ago
RES to Take Care of Walney 1 OFTO Assets
Wind Farms

RES to Take Care of Walney 1 OFTO Assets

RES has been awarded a five year contract to provide O&M services to offshore transmission assets owned by Blue Transmission Walney 1 Ltd. In addition to providing the scheduled and unscheduled maintenance of the equipment, the contract will provide services related to asset and site management, log

about 10 years ago
Portugal Okays 25MW WindFloat Atlantic
Wind Farms

Portugal Okays 25MW WindFloat Atlantic

The Council of Ministers in Portugal has approved the development of the 25MW WindFloat Atlantic (WFA) floating wind farm project in Viana do Castelo. With the approval from the government, the project can enter the offshore construction phase and will receive a license to connect to the national gr

about 10 years ago
Portugal Okays 25MW WindFloat Atlantic
Wind Farms

Portugal Okays 25MW WindFloat Atlantic

The Council of Ministers in Portugal has approved the development of the 25MW WindFloat Atlantic (WFA) floating wind farm project in Viana do Castelo. With the approval from the government, the project can enter the offshore construction phase and will receive a license to connect to the national gr

about 10 years ago

Advertisement

Final Bids in for EOWDC Research Programme
Wind Farms

Final Bids in for EOWDC Research Programme

Sixteen shortlisted candidates for a EUR 3 million scientific research programme to understand the environmental impacts of offshore wind at Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in Aberdeen, Scotland, have submitted their final bids. The shortlisted projects span topics from

about 10 years ago
GeoSea Picks CWind for Secondary Works at Galloper
Wind Farms

GeoSea Picks CWind for Secondary Works at Galloper

Belgian offshore engineering specialist GeoSea has appointed the offshore wind services provider CWind to undertake required secondary works at the 336MW Galloper offshore wind farm for a period of approximately six months starting in December 2016. This involves a wide range of tasks including, pai

about 10 years ago
DONG Orders 116 Hornsea One Monopiles from EEW SPC
Wind Farms

DONG Orders 116 Hornsea One Monopiles from EEW SPC

DONG Energy has awarded the Rostock-based EEW Special Pipe Constructions GmbH with a contract to manufacture 116 monopiles for the 174-turbine Hornsea Project One offshore wind farm in the UK. “Due to the scale of the project, Hornsea Project 1 has changed the way we are doing offshore wind projects

about 10 years ago
EA1 Jacket Foundation Tender Result: Navantia 42, Lamprell 60
Wind Farms

EA1 Jacket Foundation Tender Result: Navantia 42, Lamprell 60

Today (25 November), Navantia reported that it signed a contract for 42 East Anglia One jacket foundations, eight more than the initial number of foundations it was supposed to build, thus solving the equation that emerged after Lamprell announced it will build 60 jackets for the 102-turbine project

about 10 years ago
Tekmar to Keep Merkur Cables Protected
Wind Farms

Tekmar to Keep Merkur Cables Protected

UK-based cable protection systems (CPS) specialist Tekmar Energy has been awarded a contract with Tideway B.V, part of DEME Group, to supply 150 of its TekLink CPS units for the 396MW Merkur offshore wind farm project in the German part of the North Sea. The supply for the contract will be executed

about 10 years ago

Advertisement

Works on Hywind Scotland Foundations in Full Swing
Wind Farms

Works on Hywind Scotland Foundations in Full Swing

Navantia started welding together the first blocks for the first Hywind Scotland floating foundation at the assembly area of its Fene yard in Spain. Each of the five spar-type floating foundations will be made of five blocks, and Navantia currently has around 15 blocks in different fabrication stage

about 10 years ago
Works on Hywind Scotland Foundations in Full Swing
Wind Farms

Works on Hywind Scotland Foundations in Full Swing

Navantia started welding together the first blocks for the first Hywind Scotland floating foundation at the assembly area of its Fene yard in Spain. Each of the five spar-type floating foundations will be made of five blocks, and Navantia currently has around 15 blocks in different fabrication stage

about 10 years ago
LIPA, Deepwater Wind to Agree on South Fork OWF by Year End
Wind Farms

LIPA, Deepwater Wind to Agree on South Fork OWF by Year End

Deepwater Wind and the Long Island Power Authority (LIPA), who were set to reach an agreement on the 90MW Deepwater ONE – South Fork project in July, are now expected to do so by the end of this year, according to the national media. Namely, LIPA was expected to approve the offshore wind farm off Lo

about 10 years ago
Wikinger Update: Navantia Sends Off Last Jackets, Turbine Parts Arriving in Sassnitz
Wind Farms

Wikinger Update: Navantia Sends Off Last Jackets, Turbine Parts Arriving in Sassnitz

Works on Iberdrola’s Wikinger offshore wind project are in full swing as the foundation installation is underway and is expected to be completed soon, as Bladt and Navantia dispatched their final jacket foundations and first components of Adwen 5MW wind turbines arrived at the Port of Sassnitz-Mukra

about 10 years ago