Wind Farms
Bladt Sends Off First Wikinger Jackets
The first jacket foundations built by Bladt Industries for the Wikinger offshore wind project have left the company’s facilities at Lindø Industripark on a barge early this morning, with Sassnitz in Germany as the next stop. The jacket foundations weigh approximately 650 tonnes and have a footprint
Bladt Sends Off First Wikinger Jackets
The first jacket foundations built by Bladt Industries for the Wikinger offshore wind project have left the company’s facilities at Lindø Industripark on a barge early this morning, with Sassnitz in Germany as the next stop. The jacket foundations weigh approximately 650 tonnes and have a footprint
100 Turbines Up at Gemini
Van Oord has installed the 100th turbine at the 600MW Gemini offshore wind farm off the coast of the Netherlands. The installation of the 150 4MW Siemens turbines started in February 2016 when Van Oord’s offshore installation vessel, Aeolus, transported the first six turbines from the port of Esbjer
Last Nobelwind Foundation Pieces Arrive to Port of Ostend
The last 10 foundation components for the Nobelwind project arrived onboard the vessel Drago J to the port of Ostend on 7 July. The REBO terminal at Energy Port Oostende has been in full operation for a few months now. As of March, foundation components have been arriving on the REBO site every 2 to
Three French OWFs Greenlighted; Courseulles-Sur-Mer Could Face Appeal
The first three offshore wind projects off the French coast, to be developed by EDF and Enbridge off Saint-Nazaire, Fécamp and Courseulles-sur-mer, have received prefectural orders “authorizing the installation and operation” of wind farms. However, the 450MW project off Courseulles-sur-mer could fa
Three French OWFs Greenlighted; Courseulles-Sur-Mer Could Face Appeal
The first three offshore wind projects off the French coast, to be developed by EDF and Enbridge off Saint-Nazaire, Fécamp and Courseulles-sur-mer, have received prefectural orders “authorizing the installation and operation” of wind farms. However, the 450MW project off Courseulles-sur-mer could fa
Polar Queen to Help Out at Nordsee One
Senvion will use GC Rieber Shipping’s construction support vessel (CSV) Polar Queen to support turbine commissioning at the Nordsee One wind farm in the German North Sea. The vessel will provide transfer of personnel and cargoes, and will be fitted with a motion compensated gangway and boat landings
ABS Group Wins Borkum Riffgrund 2 Certification Contract
The UK-based ABS Group Ltd. has received a contract to provide project certification services to DONG Energy for the planned 450MW Borkum Riffgrund 2 offshore wind farm in Germany. ABS Group’s certification scope will cover project quality management and document review, as well as manufacturing ins
ABS Group Wins Borkum Riffgrund 2 Certification Contract
The UK-based ABS Group Ltd. has received a contract to provide project certification services to DONG Energy for the planned 450MW Borkum Riffgrund 2 offshore wind farm in Germany. ABS Group’s certification scope will cover project quality management and document review, as well as manufacturing ins
Timetable Set for Examination of East Anglia Three Application
The UK Planning Inspectorate has set out a timetable for the examination of the East Anglia Three offshore wind farm application and issued procedural decisions made after the Preliminary Meeting, held on 28 June. The application was submitted by ScottishPower Renewables in November 2015 and accepte
Photo of the Day: Haliade Nacelles Ready for Trip to USA
GE Renewable Energy has shared an image of two of the five Haliade 150 6MW nacelles ready to be loaded and start their journey across the Atlantic to the Port of Providence, Rhode Island, and become the heart of the first turbines ever to generate power offshore the USA at the 30MW Block Island wind
Piling Continues at Rampion
Piling work to install wind turbine foundations at the 400MW Rampion offshore wind farm has recommenced this week, following the black bream spawning season coming to a close, E.ON said. 20 monopile foundations, each weighing between 500 and 800 tonnes depending on water depth, have already been ins
Borssele 1&2 World’s Cheapest Offshore Wind Farm
The cost of building and operating the 700MW Borssele 1 and 2 offshore wind farm is expected to be EUR 2.7 billion cheaper than previously estimated. Moreover, the wind farm will generate 22.5% more electricity than anticipated. Fierce competition between companies in the public tender to secure the
Dutch Government Pinpoints Two Areas for 2.1GW of Offshore Wind
Hollandse Kust Zuid (South) and Hollandse Kust Noord (North) offshore wind zones, totalling 2.1GW of potential offshore wind capacity, have been selected for the construction of offshore wind farms by the Dutch government in an effort to reach the goal of 16% of renewable energy in the country’s ene