Wind Farms
First Foundations Installed at Wikinger OWF
The first wind turbine foundations have been installed at the 350MW Wikinger offshore wind farm, Iberdrola, the owner and developer of the wind farm located in the German part of the Baltic Sea, said. The milestone was announced in the Spanish utility’s financial report for the first quarter of 2016
K2 Management Dives Deep into EnBW Hohe See Project
K2 Management is currently carrying out comprehensive due diligence of the 500MW EnBW Hohe See offshore wind farm as part of its first full lenders’ technical advisor role for the project. Having completed the initial “bankability” review, K2 Management is now focusing in detail on the key technical
East Anglia ONE’s Price of £119/MWh Confirmed
Low Carbon Contracts Company (LCCC), a UK government-owned company created to deliver key elements of the Electricity Market Reform Programme, confirmed that Contract for Difference (CfD) milestones for East Anglia ONE have been fulfilled. With the CfD milestones achieved and confirmed by the Low Ca
Aibel Picks Granada Python Cranes for Hywind
Aibel has awarded a contract to the Manchester-based Granada Material Handling Ltd to design, manufacture, deliver and commission 10 davit crane units for the 30MW Hywind Scotland Pilot Park, the world’s first floating wind farm situated off Peterhead, Aberdeenshire. Two Granada Python crane units,
N-Sea Keeping Galloper Safe from UXO
N-Sea has been awarded a pre-construction unexploded ordnance (UXO) contract with Galloper Offshore Wind Farm Ltd (GWFL). The clearance works commenced in April 2016 and include UXO risk management, target investigations and clearance on the Galloper wind farm, off the coast of Suffolk. Expected to
N-Sea Keeping Galloper Safe from UXO
N-Sea has been awarded a pre-construction unexploded ordnance (UXO) contract with Galloper Offshore Wind Farm Ltd (GWFL). The clearance works commenced in April 2016 and include UXO risk management, target investigations and clearance on the Galloper wind farm, off the coast of Suffolk. Expected to
Saint-Nazaire OWF Cleared for Takeoff
France’s Loire-Atlantique prefecture has granted approval for the construction of the 480MW Saint-Nazaire offshore wind farm. The approval allows for the official start of the construction phase, and establishes the conditions for the installation and operation of the offshore wind farm which is bei
Photo of the Day: Horns Rev C Topside Falling Into Place
Seaway Heavy Lifting has shared this photo of the heavy-lifting vessel Stanislav Yudin setting the topside of the Horns Rev C substation down onto the jacket construction. The topside was transported from the Port of Esbjerg to the installation site some 20 kilometers off the Danish North Sea coast
STX France Lands Arkona Offshore Substation Contract
STX France SA has won the contract to design, build and install a HVAC offshore substation for the 385MW Arkona offshore wind farm. STX France will perform an EPCI contract for the jacket foundation, the piles, and the substation topside. The contract includes a one year maintenance period, followin
Van Oord Hired for Arkona’s Foundation Installation
E.ON has awarded the contract for the transport and installation of foundations at the Arkona offshore wind project in the German Baltic Sea to Van Oord. Van Oord intends to deploy its heavy lift installation vessel Svanen to install the project’s 60 monopiles and transition pieces. Arnoud Kuis, Man
Van Oord Hired for Arkona’s Foundation Installation
E.ON has awarded the contract for the transport and installation of foundations at the Arkona offshore wind project in the German Baltic Sea to Van Oord. Van Oord intends to deploy its heavy lift installation vessel Svanen to install the project’s 60 monopiles and transition pieces. Arnoud Kuis, Man
VBMS to Lay Inter Array Cables at E.ON’s Latest Offshore Wind Project
VBMS has been awarded a contract by E.ON for the installation of 65 inter array cables for the Arkona offshore wind farm. The total scope of work for VBMS will consist of route engineering, surveying, a pre-lay grapnel run, trenching, termination and testing of the 65 cables. Survey activities are s
A2SEA Nets Arkona Turbine Installation Contract
A2SEA has won the contract to install sixty six-megawatt Siemens wind turbines at the 385MW Arkona offshore wind farm in the German part of the Baltic Sea. A2SEA will start turbine installation works in the summer of 2018. The company will use the offshore installation vessel Sea Challenger for the
E.ON and Statoil to Jointly Build 385MW Arkona Offshore Wind Farm
Germany’s E.ON and Norwegian energy company Statoil have teamed up on a EUR 1.2 billion project to build the 385MW Arkona offshore wind farm in the German waters of the Baltic Sea. Statoil will have a 50-percent stake and will be involved in the project from the start. E.ON, the holder of the remain