Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsOperations & Maintenance
EEW SPC Bags Nobelwind Foundations Contract
Wind Farms

EEW SPC Bags Nobelwind Foundations Contract

EEW Special Pipe Constructions GmbH received an order from Nobelwind NV to manufacture 50 monopiles and one monopile foundation for the substation for the Nobelwind offshore wind farm (formerly Bligh Bank) in Belgium. The offshore wind farm will have a capacity of 165 MW and is located approx. 47 km

about 11 years ago
FoundOcean Completes Grouting at Gode Wind 1 & 2
Wind Farms

FoundOcean Completes Grouting at Gode Wind 1 & 2

FoundOcean, on behalf of Geosea, has completed the grouting of the XL monopile foundations at DONG Energy’s Gode Wind 1 and 2 offshore wind farm. The wind farm, which is located in the German sector of the North Sea, is the latest wind farm to fix its foundations using the MasterFlow 9500 material f

about 11 years ago
Humber Gateway Offshore Wind Farm Officially Opened
Wind Farms

Humber Gateway Offshore Wind Farm Officially Opened

E.ON’s Humber Gateway Offshore Wind Farm was today officially opened by Minister of State for Energy and Climate Change, Andrea Leadsom MP. The 73-turbine wind farm, which is located 8km off the Holderness coast, went into full operation in May and will provide enough electricity for around 170,000

about 11 years ago
Humber Gateway Offshore Wind Farm Officially Opened
Wind Farms

Humber Gateway Offshore Wind Farm Officially Opened

E.ON’s Humber Gateway Offshore Wind Farm was today officially opened by Minister of State for Energy and Climate Change, Andrea Leadsom MP. The 73-turbine wind farm, which is located 8km off the Holderness coast, went into full operation in May and will provide enough electricity for around 170,000

about 11 years ago
Fabricom Does Its Magic at Princess Amaliawindpark
Wind Farms

Fabricom Does Its Magic at Princess Amaliawindpark

On August 31, Fabricom completed the Offshore Wind Modification Services for the Princess Amaliawindpark. All 60 wind turbines have been provided with a bearing package, which consists of 2 steel supports, a rubber bearing, a top and bottom plate. The steel supports have been welded to the inside of

about 11 years ago
OMM Protects Sandbank’s Subsea Cables
Wind Farms

OMM Protects Sandbank’s Subsea Cables

Offshore Marine Management (OMM) has completed another mattressing project in the German North Sea. The contract, which required the company to install mattresses at all cable crossings along the 70km route from Sandbank offshore wind farm to the converter station SylWin Alpha, was awarded in June 2

about 11 years ago
OMM Protects Sandbank’s Subsea Cables
Wind Farms

OMM Protects Sandbank’s Subsea Cables

Offshore Marine Management (OMM) has completed another mattressing project in the German North Sea. The contract, which required the company to install mattresses at all cable crossings along the 70km route from Sandbank offshore wind farm to the converter station SylWin Alpha, was awarded in June 2

about 11 years ago
Dominion to Reinvite Virginia Offshore Wind Bids
Wind Farms

Dominion to Reinvite Virginia Offshore Wind Bids

Dominion Virginia Power, which had frozen its offshore wind development planned off Virginia, has decided to once again invite bids for the construction of its project, most likely in the first three months of 2016, according to Bloomberg. In April, the company announced that it had put on hold the

about 11 years ago
Eneco Luchterduinen Completed ahead of Schedule & Officially Open
Wind Farms

Eneco Luchterduinen Completed ahead of Schedule & Officially Open

The Eneco Luchterduinen offshore wind farm was put into operation, which was officially celebrated yesterday with a traditional Japanese Kagami Biraki ceremony. The wind farm, owned jointly by Mitsubishi Corporation and Eneco, comprises 43 wind turbines and is located 23 kilometres off the coast of

about 11 years ago
EnBW Baltic 2 Put into Operation
Wind Farms

EnBW Baltic 2 Put into Operation

In the presence of the Minister President of Mecklenburg-Vorpommern, Erwin Sellering, and numerous guests from the worlds of business and politics, EnBW Energie Baden-Württemberg AG has officially put its second offshore wind farm in the Baltic Sea into operation. Following a construction period of

about 11 years ago
Dong Completes Foundation Installation at Gode Wind 1, 2
Wind Farms

Dong Completes Foundation Installation at Gode Wind 1, 2

At the two offshore wind farms Gode Wind 1 and 2, the last of 97 foundations has been installed. Dong Energy achieved this milestone ahead of schedule due to smooth foundation installation. Altogether, the installation of the 97 monopiles and transition pieces took five months. Trine Borum Bojsen, M

about 11 years ago
Preparation for Rampion Construction Begins
Wind Farms

Preparation for Rampion Construction Begins

Work will begin this week at the Rampion Offshore Wind Farm, in readiness for the first foundation installation in January. This will include clearing boulders on the seabed along the cable route and around each of the 116 foundation positions to allow safe and effective installation. Chris Tomlinso

about 11 years ago
Inter Array Cabling Starts at Sandbank OWF
Wind Farms

Inter Array Cabling Starts at Sandbank OWF

By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the

about 11 years ago
Inter Array Cabling Starts at Sandbank OWF
Wind Farms

Inter Array Cabling Starts at Sandbank OWF

By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the

about 11 years ago
  • 1
  • …
  • 404
  • 405
  • 406
  • …
  • 505