Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
NewsStorageResearch & DevelopmentAuthorities & GovernmentProject & Tenders
Germany: Crane Vessel Stanislav Yudin Transports Tripods to Trianel Wind Farm Borkum
Wind Farms

Germany: Crane Vessel Stanislav Yudin Transports Tripods to Trianel Wind Farm Borkum

The beginning of the month of March has seen the crane vessel, Stanislav Yudin, launch the transportation of tripods from the offshore terminal in Bremerhaven BLG to the Trianel Wind Farm Borkum. The vessel has been transporting two by two of these up to 900 ton and 60 meter high tripods to the cons

about 13 years ago
Belgium: Construction Work Starts on Final Phase of Thornton Bank Offshore Wind Farm
Wind Farms

Belgium: Construction Work Starts on Final Phase of Thornton Bank Offshore Wind Farm

Following the successful commissioning of the second phase of the C-Power offshore wind farm (Thornton Bank Offshore Wind Farm) in late 2012, EDF Energies Nouvelles is announcing the start of construction work on the third phase of the project with 110.7 MW in capacity. Built in Belgium by the partn

about 13 years ago
Belgium: Construction Work Starts on Final Phase of Thornton Bank Offshore Wind Farm
Wind Farms

Belgium: Construction Work Starts on Final Phase of Thornton Bank Offshore Wind Farm

Following the successful commissioning of the second phase of the C-Power offshore wind farm (Thornton Bank Offshore Wind Farm) in late 2012, EDF Energies Nouvelles is announcing the start of construction work on the third phase of the project with 110.7 MW in capacity. Built in Belgium by the partn

about 13 years ago
Six Turbines Installed at Teesside Offshore Wind Farm (UK)
Wind Farms

Six Turbines Installed at Teesside Offshore Wind Farm (UK)

EDF Energy Renewables reported on February 18 that six turbines have been completely installed ahead of commissioning and a seventh tower was awaiting the addition of its blades on the Teesside Offshore Windfarm. The MPI Adventure, a large six-leg jack up vessel designed to transport, lift and insta

about 13 years ago
Germany: CS Sovereign Commence Wiring at Global Tech I
Wind Farms

Germany: CS Sovereign Commence Wiring at Global Tech I

Medium voltage cables are successively being installed at the Global Tech I offshore wind farm where 17 foundations were already installed. 80 wind turbines will be connected with the submarine power cables to the transformer station. A special cable-laying vessel CS Sovereign is performing the layi

about 13 years ago
UK: Borehole Survey at Dogger Bank Creyke Beck Landfall Site
Wind Farms

UK: Borehole Survey at Dogger Bank Creyke Beck Landfall Site

Specialist contractors working for Forewind will drill three boreholes near the proposed landfall location for the Dogger Bank Creyke Beck export cables this week to understand the soil strata and geotechnical information of the site. The three boreholes will be drilled on arable land approximately

about 13 years ago
Denmark Initiates Offshore Wind Tendering Process
Wind Farms

Denmark Initiates Offshore Wind Tendering Process

In March 2012, the Danish Government entered into an energy agreement with several other political parties from the Danish Parliament. The agreement secures the needed investments for a further step to improve Denmark’s production of renewable energy. By the agreement the parties have decided to ini

about 13 years ago
BOWL Partnership Gets Planning Permission in Principle from the Moray Council (UK)
Wind Farms

BOWL Partnership Gets Planning Permission in Principle from the Moray Council (UK)

Beatrice Offshore Windfarm Ltd (BOWL), the joint venture partnership formed between SSE Renewables (75%) and Repsol Nuevas Energias UK (25%) has today been granted Planning Permission in Principle by The Moray Council’s Planning and Regulatory Services Committee to develop the onshore transmission w

about 13 years ago
BOWL Partnership Gets Planning Permission in Principle from the Moray Council (UK)
Wind Farms

BOWL Partnership Gets Planning Permission in Principle from the Moray Council (UK)

Beatrice Offshore Windfarm Ltd (BOWL), the joint venture partnership formed between SSE Renewables (75%) and Repsol Nuevas Energias UK (25%) has today been granted Planning Permission in Principle by The Moray Council’s Planning and Regulatory Services Committee to develop the onshore transmission w

about 13 years ago
Kentish Flats Offshore Wind Farm Extension Gets Development Consent (UK)
Wind Farms

Kentish Flats Offshore Wind Farm Extension Gets Development Consent (UK)

Vattenfall’s Kentish Flats Extension has received a development consent order from the Energy Secretary. The consent means that Vattenfall can step up its engagement with the local and UK supply chains as it develops a forward programme for installation and operation. The up to 17 turbine extension

about 13 years ago
Sweden: Land and Environment Court Gives Positive Opinion on Blekinge Offshore Wind Farm
Wind Farms

Sweden: Land and Environment Court Gives Positive Opinion on Blekinge Offshore Wind Farm

Land and Environment Court in Växjö, Sweden has issued a positive opinion regarding the Blekinge Offshore AB’s application for a permit to construct and operate the Blekinge offshore wind farm in Hanöbukten. Construction of larger wind farms requires good connectivity to the grid, and for this proje

about 13 years ago
Germany: Installation of Topside for Riffgat Offshore Wind Farm Completed
Wind Farms

Germany: Installation of Topside for Riffgat Offshore Wind Farm Completed

The offshore installation of the topside for Riffgat wind farm has been completed on Saturday, February 16th 2013. The topside, delivered on turnkey basis by Strukton Hollandia JointVenture, left the fabrication yard in Krimpen aan de IJssel one week ago. The topside has been lifted on board the SHL

about 13 years ago
Germany: SOC to Lay Inner Array Grid Cables for Baltic 2 Offshore Wind Farm
Wind Farms

Germany: SOC to Lay Inner Array Grid Cables for Baltic 2 Offshore Wind Farm

Siem Offshore Contractors GmbH (“SOC”), a wholly owned subsidiary of Siem Offshore Inc., announced that SOC has been awarded the contract for the installation of the inner array grid cables for the Baltic 2 Offshore Wind Farm (“OWF”) project by EnBW Baltic 2 GmbH (“EnBW”), a subsidiary of EnBW Erneu

about 13 years ago
UK: FoundOcean Completes Grouting for Narec’s NOAH Met Mast
Wind Farms

UK: FoundOcean Completes Grouting for Narec’s NOAH Met Mast

FoundOcean has completed the grouting contract for Narec’s Offshore Anemometry Hub (NOAH), under contract to SeaRoc. The NOAH contract was a notable project in another very successful year for FoundOcean which included offshore operations in the United Arab Emirates, South East Asia, Australia, Indi

about 13 years ago
  • 1
  • …
  • 477
  • 478
  • 479
  • …
  • 504