Wind Farms
Cable Laying for Walney 2 (UK)
At Cleveleys near Blackpool, the Stemat Spirit cable barge arrived just off shore in the afternoon of Saturday 7 May. It beached in the early hours of Sunday 8 May in the morning, waiting for very low tide. At about 9 a.m., the process of pulling the cable from the spool on board the […]
Seaway Heavy Lifting on Schedule at Sheringham Shoal (UK)
Although the project had faced a critical preparation and mobilisation schedule on Wednesday 20 April 2011, the newly built 5000 mT Heavy Lift Vessel (HLV) Oleg Strashnov sailed on schedule for its maiden trip to the Sheringham Shoal Offshore Wind Farm location. The vessel was loaded with 4 220 Ton,
London Array Offshore Wind Farm Worker Severely Injured (UK)
WALTON lifeboat was called out to help a man whose face had been severely injured in an accident involving an electrical grinder. (clactonandfrintongazette) [mappress] Source: clactonandfrintongazette, May 16, 2011;
Work Begin on Expansion of Belgium’s Thornton Bank Offshore Wind Farm
Installation of the first foundation structures marks the start of works to extend the Thornton Bank wind farm, located off the Belgian coast. In recent weeks, the underwater area has been prepared. Now works are starting to drive the first steel piles into the sea bed. Each pile is about 40 metres
Aarsleff and Bilfinger Berger Sign Contract for Offshore Wind Farm DanTysk in North Sea (Germany)
Today, Aarsleff and German Bilfinger Berger GmbH entered into a contract for the execution of the offshore wind farm DanTysk. (aarsleff) [mappress] Source: aarsleff, April 14, 2011
Tunoe Knob Offshore Wind Farm Still Spinning (Denmark)
Ten turbines at Tunoe Knob in Denmark mark the very beginning of the offshore era in Vestas. Built in 1995, they are the oldest Vestas turbines located offshore. Looking ahead properly sometimes also requires looking back. On the brink of a new era of offshore wind power plants and giant turbines, t
Seaway Heavy Lifting Wins Deal to Install Substations and Foundations on Sheringham Shoal (UK)
Seaway Heavy Lifting announces that it’s being awarded by Scira Offshore Energy Ltd the Foundation installation contract, including installation of two offshore Substation Topsides for the Sheringham Shoal project. Sheringham Shoal is a wind farm of 88 turbines and 2 substations over an area of 35 k
Constructions Start on London Array Offshore Wind Farm (UK)
As people begin arriving in Brussels on Sunday for the EWEA 2011 Annual Event, it’s a safe bet that many of them will be talking about what is expected to become the world’s largest offshore wind farm. The three developers of the London Array announced on Tuesday that the first of 177 foundations ha
First Foundation at London Array Installed by A2SEA’s Seaworker (UK)
DONG Energy, E.ON and Masdar today (8th March) announced that the first of 177 foundations has been installed at the London Array Offshore Wind Farm, in the Thames Estuary. The monopile, weighing 268 tonnes – the equivalent of around 35 double decker buses – was supplied and installed by joint ventu
Gamesa Seeks to Reserve Four Spots for Its Turbines at IREC’s ZÈFIR Test Station Offshore Wind Farm (Spain)
* Gamesa aims to install two anchored and two floating turbines at the experimental offshore wind laboratory off the coast of Tarragona, Spain * The project marks further progress in the company’s offshore strategy, as Gamesa designs and develops two families of 5 MW and 6 MW-7 MW turbines Gamesa, a
Thanet Businesses to Get Thousand of Pounds as Work Kicks Off at London Array Offshore Wind Farm (UK)
THANET businesses are to get a welcome boost worth thousands of pounds as work begins on a new project to build the world’s biggest wind… By saul leese (thisiskent) [mappress] Source: thisiskent, January 28, 2011
First Parts Delivered for Ormonde Offshore Wind Farm (UK)
The first deliveries of wind turbines and towers have started for Vattenfall’s 150 MW Osmonde Offshore Wind Farm in the Irish Sea. [mappress] Source: renewableenergyfocus, January 20, 2011
LM Wind Power to Deliver 61.5 Meter Blades for Phase II and III of Thornton Bank Offshore Wind Farm (Denmark)
LM Wind Power Blades will deliver its 61.5 meter blades for the 48 REpower 6M type wind turbines which will be installed as part of phase II and III of the Thornton Bank Offshore Wind Farm. The 144 LM 61.5P2 blades will be supplied from LM Wind Power’s facility in Lunderskov, Denmark. LM Wind Power’
OEG Offshore Completed Multimillion Wind Farm Contract (UK)
Aberdeen-based OEG Offshore (OEG) has successfully completed a £2.2million deal for a major offshore wind farm project, the firm’s first venture into the renewables sector. The company – which specialises in the design, build and rental of cabins and cargo carrying units for the offshore oil and gas