Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Subsea›Framo Engineering Bags Subsea Contract from Total E&P Angola
Subsea

October 16, 2012 · about 14 years ago

Framo Engineering Bags Subsea Contract from Total E&P Angola

Framo Engineering, a Schlumberger company, announced a $200-million contract from Total E&P Angola for the supply of a subsea multiphase pumping system for the Girassol Resources Initiatives (GirRI) Project. “This is our third contract to provide booster pump systems for Total E&P Angola’s Block 17

1 minutes read
  • LinkedIn
  • X
  • Email

Framo Engineering, a Schlumberger company, announced a $200-million contract from Total E&P Angola for the supply of a subsea multiphase pumping system for the Girassol Resources Initiatives (GirRI) Project.

“This is our third contract to provide booster pump systems for Total E&P Angola’s Block 17 asset, the first one being the Pazflor pumping system,” said Ole Steine, managing director, Framo Engineering . “Our experience in delivering more than 25 of these systems will enable us to support Total in extending the life of Girassol.”

The multiphase pump system, which will be installed in Block 17, offshore Angola at some 1,350 m water depth, will boost the rates from two production flow loops. The contract covers the complete system of topside power and control and two subsea pump modules. The pump system is based on the latest development of the helico-axial technology, capable of a record differential pressure of up to 120 bar.

The system will be assembled and tested at the Framo Engineering advanced test facility at Horsoy, Norway. Delivery is planned for summer of 2014.

[mappress] Press Release, October 16, 2012; Image: FMC Techologies

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

SubseaBusiness & FinanceEquipmentProject & Tenders

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1More work with Petrobras increases Brazilian firm's backlog to over $2 billion
  2. 2Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  3. 3Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  4. 4Lamprell tasks IMI with offshore platform and jacket fabrication scope

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free