Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Dredging›Plan Introduced for Waalwijk Container Terminal
Dredging

March 6, 2015 · about 11 years ago

Plan Introduced for Waalwijk Container Terminal

Waalwijk has far-advanced plans for the construction of a container terminal outside the dykes on the Bergsche Maas, the Port of Rotterdam Authority announced. As a result, it should be possible to handle vessels of up to 135 meters. The call for tenders for this project is planned for May or June o

1 minutes read
  • LinkedIn
  • X
  • Email

Waalwijk has far-advanced plans for the construction of a container terminal outside the dykes on the Bergsche Maas, the Port of Rotterdam Authority announced.

As a result, it should be possible to handle vessels of up to 135 meters. The call for tenders for this project is planned for May or June of this year.

The current terminal, which handles about 45,000 TEU a year, is situated behind a lock, which limits the capacity of the vessels to 89 meters with a capacity of around 40 TEU per ship. It is not possible to enlarge the current lock, for technical reasons.

The costs of the new terminal are estimated at €25 million and the municipality of Waalwijk will pay part of this itself.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

DredgingBusiness & FinanceEquipmentTechnology

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Offshore installation starts at Valeura's Gulf of Thailand field ahead of schedule
  2. 2More work with Petrobras increases Brazilian firm's backlog to over $2 billion
  3. 3Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  4. 4Golar secures 2013-built LNG carrier for conversion into fourth FLNG

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free