Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Clean Fuel›Becker Marine’s LNG Hybrid Barge ready for work
Clean Fuel

March 12, 2015 · about 11 years ago

Becker Marine’s LNG Hybrid Barge ready for work

The programme of technical trials for Becker Marine Systems’ Hummel LNG Hybrid Barge were successfully completed, right in time for the beginning of the cruise ship season. The commissioning of the barge for low-emission power supply to cruise ships lying at port in Hamburg can thus start in May 201

2 minutes read
  • LinkedIn
  • X
  • Email

The programme of technical trials for Becker Marine Systems’ Hummel LNG Hybrid Barge were successfully completed, right in time for the beginning of the cruise ship season.

The commissioning of the barge for low-emission power supply to cruise ships lying at port in Hamburg can thus start in May 2015. the company said in a statement.

“ The operation of all five of the Hummel’s generator sets recently took place as part of acceptance ,“ reported Dirk Lehmann and Henning Kuhlmann, both Managing Directors of Becker Marine Systems.

In collaboration with Bureau Veritas, the overall LNG Hybrid Barge system was tested and a variety of large load impacts and load spikes were simulated. The overall load transfer of 0 to 7.5 megawatts of power was achieved well below the time of two minutes set by the classification society, according to the statement.

“ There is thus nothing standing in the way of the LNG Hybrid Barge’s first planned supply of power to cruise ships over the course of May, ” said Hans J. Gätjens, Vice President Marine at Bureau Veritas, responsible for the Central Europe region.

The LNG Hybrid Barge was launched in Komárno, Slovakia at the beginning of September 2014 and was christened the Hummel following successful passage to the Port of Hamburg.

It works like a floating power plant and, compared to conventional marine diesel with 0.1% sulphur content, emits no sulphur dioxides or soot. Emissions of nitrogen oxides and carbon dioxide are also significantly reduced.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Clean FuelVessels

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Yinson Production achieves industry-first non-Brazil FPSO project bond at $1.46 billion
  2. 2Golar secures 2013-built LNG carrier for conversion into fourth FLNG
  3. 3Lamprell tasks IMI with offshore platform and jacket fabrication scope
  4. 4'World-first' CCS platform for industrial decarbonization stands tall offshore UK

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free